设备完整性一页纸Asset Integrity One-Pager · REC-101 · 往复压缩机REC-101 · Reciprocating Compressor

类型Type往复压缩机Reciprocating Compressor · 生成于Generated 2026-08-08 · 数据源:本地 KB(合成/工程估计)Source: local KB (synthetic / engineering estimate)
诚实声明:本页基于种子本体(prior·标准派生)生成,壁厚/材质/可靠性参数为合成或工程估计值,非装置实测;实测数据灌入后该页将自动转为 posterior(实测更新) 态。PMI/ITPM/RCM 结论不替代现场 PMI 实测与正式 FFS 评估。RCM 派生工单(source=KB.derived_rcm)为规则启发式派单,非已验证 JA1011 RCM 分析。Honesty statement: This page is generated from a seed ontology (prior · standard-derived). Wall-thickness / material / reliability parameters are synthetic or engineering estimates, NOT as-found plant measurements; once measured data is ingested the page automatically switches to the posterior (measured-update) state. PMI/ITPM/RCM conclusions do NOT replace field PMI measurement or formal FFS assessment. RCM-derived work orders (source=KB.derived_rcm) are rule-based heuristic dispatches, not validated JA1011 RCM analyses.
A
关键性等级Criticality Class
2
完整性等级 (1-5)Integrity Level (1-5)
16
失效模式 FM 数Failure Modes (FM)
7
高风险 FM (S≥8 或 O≥8)High-risk FM (S≥8 or O≥8)
70
ITPM 工单数ITPM Work Orders
2027-09
下次全面检验Next Full Inspection
AI 解读(智能洞察)AI Interpretation (Insight)

本设备共 16 个失效模式(FM),其中 7 个为高风险(S≥8 或 O≥8)。 主导风险来自「活塞杆断裂 (Rod Fracture)」(S=10, O=8, AP=高)。 主要失效机理:疲劳, 均匀腐蚀/氧化, 冲蚀/磨损, 蠕变, 外部腐蚀/CUI。 RCM 维修决策以 CBM 为主(CBM 12 / PM 0 / RTF 4)。 建议优先对高风险 FM 安排 RBI 定点测厚与在线监测复核;含合金部件须执行 PMI 抽检;缺陷按 API 579-1 FFS 闭环。This equipment has 16 failure modes (FM), of which 7 are high-risk (S≥8 or O≥8). The dominant risk is '活塞杆断裂 (Rod Fracture)' (S=10, O=8, AP=高). Main failure mechanisms: 疲劳, 均匀腐蚀/氧化, 冲蚀/磨损, 蠕变, 外部腐蚀/CUI. RCM maintenance decisions are dominated by CBM (CBM 12 / PM 0 / RTF 4). Recommendation: prioritize RBI spot thickness measurement and online-monitoring review for high-risk FMs; perform PMI sampling on alloy components; close defects per API 579-1 FFS.

由结构化 KB 数据合成(compose,非大模型实时推理);所有结论可在下方章节溯源,参数仍为合成/工程估计。Synthesized from structured KB data (compose, not real-time LLM inference); all conclusions traceable in the sections below; parameters remain synthetic / engineering estimates.

1. 设备台账与 RBI(基于风险检验)1. Equipment Registry & RBI (Risk-Based Inspection)

材质Material合金钢缸体+活塞杆
介质Service Fluid含 H₂S 工艺气(易燃+毒性)
设计温度/压力Design T/P90 ℃ / 6.0 MPa
名义壁厚/最小允许Nominal/Min WT30.0 / 24.0 mm
上次检验Last Inspection2025-09
损伤机理Damage Mechanisms疲劳、均匀腐蚀/氧化、冲蚀/磨损、蠕变、外部腐蚀/CUI
后果类型Consequence TypeSafety、Environmental
检验有效性Inspection Effectiveness0.88
置信度Confidence0.8
腐蚀速率(估)Corrosion Rate (est.)0.720 mm/yr
壁厚历史趋势(mm)Wall-thickness history trend (mm)
24.023.3
适用标准Applicable Standards
API 581-2025 API 580 API 571 API 579-1/ASME FFS-1 GB/T 44692 GB/T 21109

2. FMEA 风险画像(AIAG-VDA 2019 AP)2. FMEA Risk Profile (AIAG-VDA 2019 AP)

共 16 个 FM,其中Total {len(fms)} FMs, of which 7 个高风险(S≥8 或 O≥8)are high-risk (S≥8 or O≥8)
FMFMSSOODDAPAP后果Consequence机理Mechanism证据Evidence
活塞杆断裂 (Rod Fracture) ▸ 展开▸ expand1084Safety,Environmental3
阀座泄漏 (Seat Leak) ▸ 展开▸ expand683Safety3
连杆螺栓断裂 ▸ 展开▸ expand1043Safety,Environmental3
疲劳断裂 ▸ 展开▸ expand944Safety,Environmental3
巴氏合金磨损脱落 ▸ 展开▸ expand844Safety,Environmental3
液位控制失效 ▸ 展开▸ expand842Safety,Environmental3
阀片断裂 (Valve Plate Fracture) ▸ 展开▸ expand837Safety,Environmental3
弹簧失效 ▸ 展开▸ expand754Safety3
管束泄漏 ▸ 展开▸ expand744Safety3
活塞环磨损 (Ring Wear) ▸ 展开▸ expand644Safety3
轴颈磨损 ▸ 展开▸ expand644Safety3
油泵磨损→压力不足 ▸ 展开▸ expand644Safety3
填料磨损泄漏 ▸ 展开▸ expand544Safety3
管束结垢 ▸ 展开▸ expand453Operational3
缸套磨损 (Liner Wear) ▸ 展开▸ expand533Operational3
过滤器堵塞 ▸ 展开▸ expand523Operational3

3. PMI 材质验证判定(API RP 578)3. PMI Material Verification (API RP 578)

判定:Decision: 100pct — 合金 + 安全/环境后果 → 100% 材质验证(API RP 578 高后果实践)

4. ITPM 任务库(本设备)4. ITPM Task Library (this equipment)

CBM=23 I=5 PM=42
工单号WO ID类型Type描述Description周期(月)Interval (mo)成本cp(元)Cost cp (¥)成本cf(元)Cost cf (¥)预期风险削减Exp. Risk Reduc.成本来源Cost Source
ITPM-REC-101-C06CBM状态监测/点检(阀片断裂 (Valve Plate Fracture))100015840024.4%prior-template
ITPM-REC-101-R01CBM基于状态(On-Condition)工单(派生):阀片断裂 (Valve Plate Fracture)100015840024.4%prior-template
ITPM-REC-101-C07CBM状态监测/点检(阀座泄漏 (Seat Leak))196014080015.9%prior-template
ITPM-REC-101-R02CBM基于状态(On-Condition)工单(派生):阀座泄漏 (Seat Leak)196014080015.9%prior-template
ITPM-REC-101-C11CBM状态监测/点检(缸套磨损 (Liner Wear))10003300024.4%prior-template
ITPM-REC-101-C12CBM状态监测/点检(填料磨损泄漏)196013200010.7%prior-template
ITPM-REC-101-C08CBM状态监测/点检(弹簧失效)196014960010.7%prior-template
ITPM-REC-101-C21CBM状态监测/点检(过滤器堵塞)1960330007.1%prior-template
ITPM-REC-101-C17CBM状态监测/点检(管束结垢)19602860010.7%prior-template
ITPM-REC-101-C15CBM状态监测/点检(连杆螺栓断裂)196017600010.7%prior-template
ITPM-REC-101-R05CBM基于状态(On-Condition)工单(派生):连杆螺栓断裂196017600010.7%prior-template
ITPM-REC-101-C19CBM状态监测/点检(液位控制失效)196015840010.7%prior-template
ITPM-REC-101-R07CBM基于状态(On-Condition)工单(派生):液位控制失效196015840010.7%prior-template
ITPM-REC-101-C09CBM状态监测/点检(活塞环磨损 (Ring Wear))196014080010.7%prior-template
ITPM-REC-101-C10CBM状态监测/点检(活塞杆断裂 (Rod Fracture))196017600015.9%prior-template
ITPM-REC-101-R03CBM基于状态(On-Condition)工单(派生):活塞杆断裂 (Rod Fracture)196017600015.9%prior-template
ITPM-REC-101-C20CBM状态监测/点检(油泵磨损→压力不足)196014080010.7%prior-template
ITPM-REC-101-C16CBM状态监测/点检(巴氏合金磨损脱落)196015840010.7%prior-template
ITPM-REC-101-C18CBM状态监测/点检(管束泄漏)196014960010.7%prior-template
ITPM-REC-101-R06CBM基于状态(On-Condition)工单(派生):巴氏合金磨损脱落196015840010.7%prior-template
ITPM-REC-101-C14CBM状态监测/点检(轴颈磨损)196014080010.7%prior-template
ITPM-REC-101-C13CBM状态监测/点检(疲劳断裂)196016720010.7%prior-template
ITPM-REC-101-R04CBM基于状态(On-Condition)工单(派生):疲劳断裂196016720010.7%prior-template
ITPM-REC-101-I01I表面 MT/PT 探伤(应力集中部位)240prior-template
ITPM-REC-101-I02IUT 测厚网格扫查240prior-template
ITPM-REC-101-I03IUT 定点测厚240prior-template
ITPM-REC-101-I04I剥保温外部目视 + 抽查测厚120prior-template
ITPM-REC-101-I05I外部目视检验120prior-template
ITPM-REC-101-P22PM定期泄漏测试120prior-template
ITPM-REC-101-P23PM检查密封面120prior-template
ITPM-REC-101-P24PM定期测量活塞环间隙120prior-template
ITPM-REC-101-P25PM更换活塞环120prior-template
ITPM-REC-101-P26PM每8000小时拆检测量弹簧自由高度120prior-template
ITPM-REC-101-P27PM每15000小时更换弹簧120prior-template
ITPM-REC-101-P28PM定期磁粉探伤120prior-template
ITPM-REC-101-P29PM检查活塞杆表面120prior-template
ITPM-REC-101-P30PM定期测量缸套内径120prior-template
ITPM-REC-101-P31PM更换缸套120prior-template
ITPM-REC-101-P32PM定期壁厚测量120prior-template
ITPM-REC-101-P33PM检查水质120prior-template
ITPM-REC-101-P34PM红外热成像120prior-template
ITPM-REC-101-P35PM每日监测填料函泄漏量120prior-template
ITPM-REC-101-P36PM每月检查活塞杆表面状态120prior-template
ITPM-REC-101-P37PM每运行8000小时进行磁粉探伤检查曲轴表面及应力集中区域120prior-template
ITPM-REC-101-P38PM安装在线振动监测系统,每2周分析一次频谱,重点关注1倍频及谐波分量120prior-template
ITPM-REC-101-P39PM每季度进行润滑油铁谱分析,监测磨损颗粒浓度及形态120prior-template
ITPM-REC-101-P40PM每月测量轴颈直径,记录磨损量,当磨损量超过0.05mm时安排修复120prior-template
ITPM-REC-101-P41PM每周进行油液分析,监测铁含量,当铁含量超过50ppm时更换润滑油并检查过滤器120prior-template
ITPM-REC-101-P42PM每季度进行振动监测,分析轴颈通过频率幅值变化趋势120prior-template
ITPM-REC-101-P43PM每运行4000小时使用扭矩扳手检查螺栓预紧力,确保在标准值±5%范围内120prior-template
ITPM-REC-101-P44PM每次大修时进行超声波探伤检查螺栓根部及螺纹区域120prior-template
ITPM-REC-101-P45PM建立螺栓更换台账,每运行20000小时强制更换新螺栓120prior-template
ITPM-REC-101-P46PM每日监测轴承温度,当温度超过75℃时报警并检查120prior-template
ITPM-REC-101-P47PM每周进行振动监测,分析高频加速度包络值,趋势上升时安排检修120prior-template
ITPM-REC-101-P48PM每季度测量轴承间隙,当间隙超过设计值20%时更换轴承120prior-template
ITPM-REC-101-P49PM每运行4000小时进行化学清洗,清除管束表面水垢120prior-template
ITPM-REC-101-P50PM每周监测冷却水进出口温差,当温差下降超过10%时安排清洗120prior-template
ITPM-REC-101-P51PM每月进行水样分析,控制钙镁离子浓度在标准范围内120prior-template
ITPM-REC-101-P52PM每运行8000小时进行壳程压力试验,保压30分钟无压降120prior-template
ITPM-REC-101-P53PM每年进行氦检漏,检测泄漏率不超过1×10^-6 Pa·m³/s120prior-template
ITPM-REC-101-P54PM每季度进行超声波测厚,当壁厚减薄超过20%时更换管束120prior-template
ITPM-REC-101-P55PM每月校准液位计,误差不超过±2%120prior-template
ITPM-REC-101-P56PM每季度检查控制阀动作,确保全行程时间不超过5秒120prior-template
ITPM-REC-101-P57PM设置高低液位报警,每班次确认报警功能正常120prior-template
ITPM-REC-101-P58PM每日监测油压,当压力低于设定值0.2MPa时报警并检查120prior-template
ITPM-REC-101-P59PM每月进行油液分析,监测铁含量,当铁含量超过100ppm时安排检修120prior-template
ITPM-REC-101-P60PM每运行10000小时解体检查油泵齿轮和轴承磨损情况120prior-template
ITPM-REC-101-P61PM每运行2000小时更换滤芯,并记录压差初始值120prior-template
ITPM-REC-101-P62PM每日监测过滤器压差,当压差超过0.1MPa时立即更换120prior-template
ITPM-REC-101-P63PM每月进行油液清洁度检测,确保NAS 1638等级不超过8级120prior-template

4.1 处方与成本权衡4.1 Prescription & Cost Trade-off

成本取自 crq 参数(cp=检验成本,cf=失效纠正成本),预期风险削减为不执行该工单的年度失效概率上限近似。当前 crq 未标实测来源,统一标注 prior-template(非装置实测成本);实测数据经 ingest_measured 审批并入后转 posterior,削减值将升级为风险成本率精算(goal_planning._cost_rate_at)。Costs are drawn from crq parameters (cp = inspection cost, cf = failure correction cost); expected risk reduction approximates the upper bound of annual failure probability if the work order is not executed. Current crq has no measured source, uniformly tagged prior-template (not as-found plant cost); once measured data is approved and ingested via ingest_measured it switches to posterior, and the reduction upgrades to a risk-cost-rate actuarial value (goal_planning._cost_rate_at).

5. RCM 维修决策(策略落地)5. RCM Maintenance Decisions (Strategy Landing)

本设备 16/16 个 FM 已落 RCM 维修决策;分布:16/16 FMs have RCM decisions; distribution: CBM 12 RTF 4 工程推导eng. infer

高风险 FM 的 RCM 维修决策RCM decisions for high-risk FMs
FMFM决策Decision策略Strategy推荐任务Task间隔Interval
阀片断裂 (Valve Plate Fracture)RTF设计改进/探测任务(Redesign)无损检测(UT/MT/PT) 监测裂纹萌生, 关键转动件定时拆检; 管道支撑/缓冲设计 + 操作程序优化(RTF); 标定/零点-跨度校验 + SIL Proof test + 阀门行程试验 + 变更管理; 泄漏监测 + 密封/填料定期更换, 螺栓热紧固高风险 1-3 月 / 中风险 6-12 月 / 低风险 检修期 (按 RBI 风险定级)
阀座泄漏 (Seat Leak)RTF设计改进/探测任务(Redesign)材质复检 + 无损检测 + 设计/材质升级整改(RTF); 标定/零点-跨度校验 + SIL Proof test + 阀门行程试验 + 变更管理; 泄漏监测 + 密封/填料定期更换, 螺栓热紧固; 振动频谱分析 + 动平衡 + 激光对中, 状态监测趋势管理; 无损检测(UT/VT/MT/PT), 按 API 581 RBI 风险定级设定检验间隔高风险 1-3 月 / 中风险 6-12 月 / 低风险 检修期 (按 RBI 风险定级)
活塞杆断裂 (Rod Fracture)CBM视情维修(On-Condition)无损检测(UT/MT/PT) 监测裂纹萌生, 关键转动件定时拆检; 振动频谱分析 + 动平衡 + 激光对中, 状态监测趋势管理高风险 1-3 月 / 中风险 6-12 月 / 低风险 检修期 (按 RBI 风险定级)
疲劳断裂CBM视情维修(On-Condition)无损检测(UT/MT/PT) 监测裂纹萌生, 关键转动件定时拆检; 振动频谱分析 + 动平衡 + 激光对中, 状态监测趋势管理高风险 1-3 月 / 中风险 6-12 月 / 低风险 检修期 (按 RBI 风险定级)
连杆螺栓断裂CBM视情维修(On-Condition)无损检测(UT/MT/PT) 监测裂纹萌生, 关键转动件定时拆检高风险 1-3 月 / 中风险 6-12 月 / 低风险 检修期 (按 RBI 风险定级)
巴氏合金磨损脱落CBM视情维修(On-Condition)无损检测(UT/MT/PT) 监测裂纹萌生, 关键转动件定时拆检; 温度/红外热成像监测, 超温报警与根因排查; 振动频谱分析 + 动平衡 + 激光对中, 状态监测趋势管理; 蠕变测量/金相监测, 按剩余寿命管理高风险 1-3 月 / 中风险 6-12 月 / 低风险 检修期 (按 RBI 风险定级)
液位控制失效RTF设计改进/探测任务(Redesign)按压差/效率监测设定清洗周期 + 过滤/防堵维护; 管道支撑/缓冲设计 + 操作程序优化(RTF); 标定/零点-跨度校验 + SIL Proof test + 阀门行程试验 + 变更管理高风险 1-3 月 / 中风险 6-12 月 / 低风险 检修期 (按 RBI 风险定级)

ITPM 总工单 70 张,RCM 派生 0 张;KB→工单闭环已建立,供 CMMS/SAP 消费。所有决策均属工程推导(非实测台账),执行前须经设备主管确认。Total 70 ITPM work orders, 0 RCM-derived; KB→work-order closed loop established for CMMS/SAP consumption. All decisions are engineering inference (not measured field data), subject to equipment-owner confirmation before execution.

6. 完整性结论与行动6. Integrity Conclusion & Actions

MIQA 状态MIQA Statusin_service
完整性等级Integrity Level2 / 5
上次全面检验Last Full Inspection2025-09
下次检验到期Next Inspection Due2027-09
MOC 关联MOC LinkMOC-OPC-REC-101
建议优先级Recommended Priority

存在 7 个高风险 FM,建议优先安排 RBI 定点测厚与在线监测复核;对含合金部件执行 PMI 抽检。缺陷按 API 579-1 FFS 闭环。There are 7 high-risk FMs; prioritize RBI spot thickness measurement and online-monitoring review; perform PMI sampling on alloy components. Close defects per API 579-1 FFS.