设备完整性一页纸Asset Integrity One-Pager · SC-101 · 螺杆压缩机SC-101 · Screw Compressor

类型Type螺杆压缩机Screw Compressor · 生成于Generated 2026-08-08 · 数据源:本地 KB(合成/工程估计)Source: local KB (synthetic / engineering estimate)
诚实声明:本页基于种子本体(prior·标准派生)生成,壁厚/材质/可靠性参数为合成或工程估计值,非装置实测;实测数据灌入后该页将自动转为 posterior(实测更新) 态。PMI/ITPM/RCM 结论不替代现场 PMI 实测与正式 FFS 评估。RCM 派生工单(source=KB.derived_rcm)为规则启发式派单,非已验证 JA1011 RCM 分析。Honesty statement: This page is generated from a seed ontology (prior · standard-derived). Wall-thickness / material / reliability parameters are synthetic or engineering estimates, NOT as-found plant measurements; once measured data is ingested the page automatically switches to the posterior (measured-update) state. PMI/ITPM/RCM conclusions do NOT replace field PMI measurement or formal FFS assessment. RCM-derived work orders (source=KB.derived_rcm) are rule-based heuristic dispatches, not validated JA1011 RCM analyses.
推算est.
关键性等级Criticality Class
4 / 5推算est.
完整性等级 (1-5)Integrity Level (1-5)
14
失效模式 FM 数Failure Modes (FM)
0
高风险 FM (S≥8 或 O≥8)High-risk FM (S≥8 or O≥8)
42
ITPM 工单数ITPM Work Orders
待实测待实测TBD
下次全面检验Next Full Inspection
AI 解读(智能洞察)AI Interpretation (Insight)

本设备共 14 个失效模式(FM),其中 0 个为高风险(S≥8 或 O≥8)。 主导风险来自「轴封泄漏(工艺气)」(S=7, O=3, AP=低)。 主要失效机理:阴/阳转子型线因润滑不良磨损,间隙增大容积效率下降(API 619 转子要求), 同步齿轮错位使阴阳转子接触擦伤(API 619 同步要求), 径向滑动轴承因油膜涡动/疲劳失效(API 619 轴承规范)。 RCM 维修决策以 CBM 为主(CBM 11 / PM 3 / RTF 0)。 当前无高风险 FM,维持既定 ITPM 周期即可。This equipment has 14 failure modes (FM), of which 0 are high-risk (S≥8 or O≥8). The dominant risk is '轴封泄漏(工艺气)' (S=7, O=3, AP=低). Main failure mechanisms: 阴/阳转子型线因润滑不良磨损,间隙增大容积效率下降(API 619 转子要求), 同步齿轮错位使阴阳转子接触擦伤(API 619 同步要求), 径向滑动轴承因油膜涡动/疲劳失效(API 619 轴承规范). RCM maintenance decisions are dominated by CBM (CBM 11 / PM 3 / RTF 0). No high-risk FMs at present; maintain the established ITPM interval.

由结构化 KB 数据合成(compose,非大模型实时推理);所有结论可在下方章节溯源,参数仍为合成/工程估计。Synthesized from structured KB data (compose, not real-time LLM inference); all conclusions traceable in the sections below; parameters remain synthetic / engineering estimates.

1. 设备台账与 RBI(基于风险检验)1. Equipment Registry & RBI (Risk-Based Inspection)

材质Material
介质Service Fluid
设计温度/压力Design T/P— ℃ / — MPa
名义壁厚/最小允许Nominal/Min WT— / — mm
上次检验Last Inspection
损伤机理Damage Mechanisms
后果类型Consequence Type
检验有效性Inspection Effectiveness
置信度Confidence
腐蚀速率(估)Corrosion Rate (est.)
壁厚历史趋势(mm)Wall-thickness history trend (mm)
无壁厚历史
适用标准Applicable Standards

2. FMEA 风险画像(AIAG-VDA 2019 AP)2. FMEA Risk Profile (AIAG-VDA 2019 AP)

共 14 个 FM,其中Total {len(fms)} FMs, of which 0 个高风险(S≥8 或 O≥8)are high-risk (S≥8 or O≥8)
FMFMSSOODDAPAP后果Consequence机理Mechanism证据Evidence
转子型线磨损 ▸ 展开▸ expand644Operational阴/阳转子型线因润滑不良磨损,间隙增大容积效率下降(API 619 转子要求)1
轴封泄漏(工艺气) ▸ 展开▸ expand733Operational,Environmental,Safety干气密封端面磨损致工艺气外泄(API 619 密封条款)1
转子接触擦伤 ▸ 展开▸ expand723Operational,Safety同步齿轮错位使阴阳转子接触擦伤(API 619 同步要求)1
滑动轴承缺陷 ▸ 展开▸ expand634Operational径向滑动轴承因油膜涡动/疲劳失效(API 619 轴承规范)1
止推轴承失效 ▸ 展开▸ expand723Operational,Safety止推瓦块因轴向过载烧瓦(API 619 轴向负荷)1
排气温度过高 ▸ 展开▸ expand633Operational,Safety排气温度超限致润滑油碳化/密封老化(API 619 温度限制)1
振动高(不平衡) ▸ 展开▸ expand543Operational质量不平衡诱发 1× 振动(ISO 1940/GB-T 6075)1
内部增速齿轮失效 ▸ 展开▸ expand723Operational,Safety内部同步/增速齿轮断齿或点蚀(API 619 齿轮条款)1
油系统污染 ▸ 展开▸ expand534Operational油污染致轴承/转子磨损(ISO 4406)1
油泵失效 ▸ 展开▸ expand623Operational主/辅油泵失效致油压低联锁停机(API 619 油系统)1
中间冷却器结垢 ▸ 展开▸ expand444Operational冷却器换热下降,排气温度上升(API 619 冷却器)1
吸气过滤器堵塞 ▸ 展开▸ expand444Operational吸气阻力增大,流量下降(API 619 进气系统)1
联轴器不对中 ▸ 展开▸ expand533Operational联轴器不对中产生附加载荷与振动1
气量调节失灵 ▸ 展开▸ expand533Operational容量调节失效致排气量失控(API 619 调节系统)1

3. PMI 材质验证判定(API RP 578)3. PMI Material Verification (API RP 578)

判定:Decision: exempt — 非承压金属/结构件,API RP 578 范围外

4. ITPM 任务库(本设备)4. ITPM Task Library (this equipment)

CBM=14 PM=28
工单号WO ID类型Type描述Description周期(月)Interval (mo)成本cp(元)Cost cp (¥)成本cf(元)Cost cf (¥)预期风险削减Exp. Risk Reduc.成本来源Cost Source
ITPM-SC-101-C09CBM状态监测/点检(吸气过滤器堵塞)300011000012.6%prior-template
ITPM-SC-101-C08CBM状态监测/点检(中间冷却器结垢)300011000013.1%prior-template
ITPM-SC-101-C10CBM状态监测/点检(排气温度过高)30001100006.3%prior-template
ITPM-SC-101-C04CBM状态监测/点检(止推轴承失效)30001100003.9%prior-template
ITPM-SC-101-C06CBM状态监测/点检(油泵失效)30001100003.9%prior-template
ITPM-SC-101-C07CBM状态监测/点检(轴封泄漏(工艺气))30001100006.8%prior-template
ITPM-SC-101-C05CBM状态监测/点检(油系统污染)30001100008.6%prior-template
ITPM-SC-101-C13CBM状态监测/点检(气量调节失灵)30001100007.2%prior-template
ITPM-SC-101-C02CBM状态监测/点检(转子接触擦伤)30001100003.4%prior-template
ITPM-SC-101-C14CBM状态监测/点检(内部增速齿轮失效)30001100003.4%prior-template
ITPM-SC-101-C01CBM状态监测/点检(转子型线磨损)300011000010.4%prior-template
ITPM-SC-101-C12CBM状态监测/点检(振动高(不平衡))300011000011.3%prior-template
ITPM-SC-101-C11CBM状态监测/点检(联轴器不对中)30001100007.7%prior-template
ITPM-SC-101-C03CBM状态监测/点检(滑动轴承缺陷)30001100007.2%prior-template
ITPM-SC-101-P15PM间隙监测120prior-template
ITPM-SC-101-P16PM油液分析120prior-template
ITPM-SC-101-P17PM同步齿轮检查120prior-template
ITPM-SC-101-P18PM振动监测120prior-template
ITPM-SC-101-P19PM油膜涡动监测120prior-template
ITPM-SC-101-P20PM轴振/瓦振120prior-template
ITPM-SC-101-P21PM轴向位移监测120prior-template
ITPM-SC-101-P22PM推力瓦温120prior-template
ITPM-SC-101-P23PM油液颗粒度分析120prior-template
ITPM-SC-101-P24PM过滤器压差120prior-template
ITPM-SC-101-P25PM油泵状态监测120prior-template
ITPM-SC-101-P26PM双泵冗余120prior-template
ITPM-SC-101-P27PM密封气流量监测120prior-template
ITPM-SC-101-P28PM泄漏检测120prior-template
ITPM-SC-101-P29PM端差监测120prior-template
ITPM-SC-101-P30PM化学清洗120prior-template
ITPM-SC-101-P31PM过滤器压差报警120prior-template
ITPM-SC-101-P32PM定期更换120prior-template
ITPM-SC-101-P33PM排气温度联锁120prior-template
ITPM-SC-101-P34PM压比核算120prior-template
ITPM-SC-101-P35PM激光对中120prior-template
ITPM-SC-101-P36PM振动谐波120prior-template
ITPM-SC-101-P37PM动平衡120prior-template
ITPM-SC-101-P38PM振动 1× 趋势120prior-template
ITPM-SC-101-P39PM调节阀校准120prior-template
ITPM-SC-101-P40PM负荷响应测试120prior-template
ITPM-SC-101-P41PM齿轮啮合监测120prior-template
ITPM-SC-101-P42PM油液铁谱120prior-template

4.1 处方与成本权衡4.1 Prescription & Cost Trade-off

成本取自 crq 参数(cp=检验成本,cf=失效纠正成本),预期风险削减为不执行该工单的年度失效概率上限近似。当前 crq 未标实测来源,统一标注 prior-template(非装置实测成本);实测数据经 ingest_measured 审批并入后转 posterior,削减值将升级为风险成本率精算(goal_planning._cost_rate_at)。Costs are drawn from crq parameters (cp = inspection cost, cf = failure correction cost); expected risk reduction approximates the upper bound of annual failure probability if the work order is not executed. Current crq has no measured source, uniformly tagged prior-template (not as-found plant cost); once measured data is approved and ingested via ingest_measured it switches to posterior, and the reduction upgrades to a risk-cost-rate actuarial value (goal_planning._cost_rate_at).

5. RCM 维修决策(策略落地)5. RCM Maintenance Decisions (Strategy Landing)

本设备 14/14 个 FM 已落 RCM 维修决策;分布:14/14 FMs have RCM decisions; distribution: CBM 11 PM 3 工程推导eng. infer

FM 维修决策样例Sample FM RCM decisions
FMFM决策Decision策略Strategy推荐任务Task间隔Interval
转子型线磨损PM主动维修(Scheduled)绝缘/电气试验 + 继电保护定值校核 + 操动机构特性测试高风险 1-3 月 / 中风险 6-12 月 / 低风险 检修期 (按 RBI 风险定级)
转子接触擦伤CBM视情维修(On-Condition)绝缘/电气试验 + 继电保护定值校核 + 操动机构特性测试; 振动频谱分析 + 动平衡 + 激光对中, 状态监测趋势管理高风险 1-3 月 / 中风险 6-12 月 / 低风险 检修期 (按 RBI 风险定级)
滑动轴承缺陷CBM视情维修(On-Condition)无损检测(UT/MT/PT) 监测裂纹萌生, 关键转动件定时拆检; 绝缘/电气试验 + 继电保护定值校核 + 操动机构特性测试高风险 1-3 月 / 中风险 6-12 月 / 低风险 检修期 (按 RBI 风险定级)
止推轴承失效CBM视情维修(On-Condition)状态监测/定期检查, 按趋势与阈值管理高风险 1-3 月 / 中风险 6-12 月 / 低风险 检修期 (按 RBI 风险定级)
油系统污染CBM视情维修(On-Condition)绝缘/电气试验 + 继电保护定值校核 + 操动机构特性测试; 按压差/效率监测设定清洗周期 + 过滤/防堵维护; 泄漏监测 + 密封/填料定期更换, 螺栓热紧固高风险 1-3 月 / 中风险 6-12 月 / 低风险 检修期 (按 RBI 风险定级)
油泵失效PM主动维修(Scheduled)标定/零点-跨度校验 + SIL Proof test + 阀门行程试验 + 变更管理高风险 1-3 月 / 中风险 6-12 月 / 低风险 检修期 (按 RBI 风险定级)
轴封泄漏(工艺气)CBM视情维修(On-Condition)泄漏监测 + 密封/填料定期更换, 螺栓热紧固高风险 1-3 月 / 中风险 6-12 月 / 低风险 检修期 (按 RBI 风险定级)
中间冷却器结垢CBM视情维修(On-Condition)按压差/效率监测设定清洗周期 + 过滤/防堵维护; 温度/红外热成像监测, 超温报警与根因排查高风险 1-3 月 / 中风险 6-12 月 / 低风险 检修期 (按 RBI 风险定级)

ITPM 总工单 42 张,RCM 派生 0 张;KB→工单闭环已建立,供 CMMS/SAP 消费。所有决策均属工程推导(非实测台账),执行前须经设备主管确认。Total 42 ITPM work orders, 0 RCM-derived; KB→work-order closed loop established for CMMS/SAP consumption. All decisions are engineering inference (not measured field data), subject to equipment-owner confirmation before execution.

6. 完整性结论与行动6. Integrity Conclusion & Actions

MIQA 状态MIQA Status
完整性等级Integrity LevelNone / 5
上次全面检验Last Full Inspection
下次检验到期Next Inspection Due
MOC 关联MOC Link
建议优先级Recommended Priority

当前无 S≥8/O≥8 高风险 FM,维持既定 ITPM 周期即可。No S≥8/O≥8 high-risk FMs at present; maintain the established ITPM interval.