设备完整性一页纸Asset Integrity One-Pager · SW-101 · 开关柜 / 断路器SW-101 · Switchgear / Circuit Breaker

类型Type开关柜 / 断路器Switchgear / Circuit Breaker · 生成于Generated 2026-08-08 · 数据源:本地 KB(合成/工程估计)Source: local KB (synthetic / engineering estimate)
诚实声明:本页基于种子本体(prior·标准派生)生成,壁厚/材质/可靠性参数为合成或工程估计值,非装置实测;实测数据灌入后该页将自动转为 posterior(实测更新) 态。PMI/ITPM/RCM 结论不替代现场 PMI 实测与正式 FFS 评估。RCM 派生工单(source=KB.derived_rcm)为规则启发式派单,非已验证 JA1011 RCM 分析。Honesty statement: This page is generated from a seed ontology (prior · standard-derived). Wall-thickness / material / reliability parameters are synthetic or engineering estimates, NOT as-found plant measurements; once measured data is ingested the page automatically switches to the posterior (measured-update) state. PMI/ITPM/RCM conclusions do NOT replace field PMI measurement or formal FFS assessment. RCM-derived work orders (source=KB.derived_rcm) are rule-based heuristic dispatches, not validated JA1011 RCM analyses.
推算est.
关键性等级Criticality Class
3 / 5推算est.
完整性等级 (1-5)Integrity Level (1-5)
14
失效模式 FM 数Failure Modes (FM)
3
高风险 FM (S≥8 或 O≥8)High-risk FM (S≥8 or O≥8)
44
ITPM 工单数ITPM Work Orders
待实测待实测TBD
下次全面检验Next Full Inspection
AI 解读(智能洞察)AI Interpretation (Insight)

本设备共 14 个失效模式(FM),其中 3 个为高风险(S≥8 或 O≥8)。 主导风险来自「内部电弧故障」(S=9, O=2, AP=高)。 主要失效机理:脱扣线圈烧毁/机构卡滞致分闸失败, 二次干扰/继电器误动致误跳, 接触电阻热累积致温升。 RCM 维修决策以 PM 为主(CBM 2 / PM 12 / RTF 0)。 建议优先对高风险 FM 安排 RBI 定点测厚与在线监测复核;含合金部件须执行 PMI 抽检;缺陷按 API 579-1 FFS 闭环。This equipment has 14 failure modes (FM), of which 3 are high-risk (S≥8 or O≥8). The dominant risk is '内部电弧故障' (S=9, O=2, AP=高). Main failure mechanisms: 脱扣线圈烧毁/机构卡滞致分闸失败, 二次干扰/继电器误动致误跳, 接触电阻热累积致温升. RCM maintenance decisions are dominated by PM (CBM 2 / PM 12 / RTF 0). Recommendation: prioritize RBI spot thickness measurement and online-monitoring review for high-risk FMs; perform PMI sampling on alloy components; close defects per API 579-1 FFS.

由结构化 KB 数据合成(compose,非大模型实时推理);所有结论可在下方章节溯源,参数仍为合成/工程估计。Synthesized from structured KB data (compose, not real-time LLM inference); all conclusions traceable in the sections below; parameters remain synthetic / engineering estimates.

1. 设备台账与 RBI(基于风险检验)1. Equipment Registry & RBI (Risk-Based Inspection)

材质Material
介质Service Fluid
设计温度/压力Design T/P— ℃ / — MPa
名义壁厚/最小允许Nominal/Min WT— / — mm
上次检验Last Inspection
损伤机理Damage Mechanisms
后果类型Consequence Type
检验有效性Inspection Effectiveness
置信度Confidence
腐蚀速率(估)Corrosion Rate (est.)
壁厚历史趋势(mm)Wall-thickness history trend (mm)
无壁厚历史
适用标准Applicable Standards

2. FMEA 风险画像(AIAG-VDA 2019 AP)2. FMEA Risk Profile (AIAG-VDA 2019 AP)

共 14 个 FM,其中Total {len(fms)} FMs, of which 3 个高风险(S≥8 或 O≥8)are high-risk (S≥8 or O≥8)
FMFMSSOODDAPAP后果Consequence机理Mechanism证据Evidence
断路器拒动 ▸ 展开▸ expand835Safety,Operational脱扣线圈烧毁/机构卡滞致分闸失败3
内部电弧故障 ▸ 展开▸ expand925Safety,Operational电弧闪络致设备与人员损伤2
保护装置失效 ▸ 展开▸ expand824Safety,Operational电子元件老化/程序异常2
局部放电 ▸ 展开▸ expand745Operational局部放电引发树状劣化2
断路器误动跳 ▸ 展开▸ expand734Operational二次干扰/继电器误动致误跳2
母排连接点过热 ▸ 展开▸ expand644Operational,Safety接触电阻热累积致温升2
操动机构卡涩 ▸ 展开▸ expand734Operational机械卡滞致分合闸失败1
绝缘老化 ▸ 展开▸ expand645Operational吸湿与污秽致绝缘下降1
控制电源丧失 ▸ 展开▸ expand734Operational控制回路失电1
柜体腐蚀(危险区域) ▸ 展开▸ expand735Safety腐蚀致防爆失效1
接地/二次回路接地不良 ▸ 展开▸ expand635Safety接地网腐蚀/断开2
电流互感器/电压互感器故障 ▸ 展开▸ expand535Safety,Operational互感器绝缘老化击穿1
在线测温装置失效 ▸ 展开▸ expand535Operational传感器失效1
通信中断 ▸ 展开▸ expand535Operational通信链路故障1

3. PMI 材质验证判定(API RP 578)3. PMI Material Verification (API RP 578)

判定:Decision: exempt — 非承压金属/结构件,API RP 578 范围外

4. ITPM 任务库(本设备)4. ITPM Task Library (this equipment)

CBM=17 PM=26 T=1
工单号WO ID类型Type描述Description周期(月)Interval (mo)成本cp(元)Cost cp (¥)成本cf(元)Cost cf (¥)预期风险削减Exp. Risk Reduc.成本来源Cost Source
ITPM-SW-101-C08CBM状态监测/点检(内部电弧故障)80003000002.0%prior-template
ITPM-SW-101-T09T功能测试(隐蔽故障发现):内部电弧故障680003000001.0%prior-template
ITPM-SW-101-R03CBM基于状态(On-Condition)工单(派生):内部电弧故障80003000002.0%prior-template
ITPM-SW-101-C15CBM状态监测/点检(通信中断)80003000003.9%prior-template
ITPM-SW-101-C02CBM状态监测/点检(断路器误动跳)80003000003.9%prior-template
ITPM-SW-101-C11CBM状态监测/点检(控制电源丧失)80003000003.9%prior-template
ITPM-SW-101-C07CBM状态监测/点检(保护装置失效)80003000003.0%prior-template
ITPM-SW-101-R02CBM基于状态(On-Condition)工单(派生):保护装置失效80003000003.0%prior-template
ITPM-SW-101-C13CBM状态监测/点检(在线测温装置失效)80003000003.0%prior-template
ITPM-SW-101-C05CBM状态监测/点检(操动机构卡涩)80003000003.9%prior-template
ITPM-SW-101-C12CBM状态监测/点检(接地/二次回路接地不良)80003000003.0%prior-template
ITPM-SW-101-C03CBM状态监测/点检(母排连接点过热)80003000005.8%prior-template
ITPM-SW-101-C01CBM状态监测/点检(断路器拒动)80003000004.9%prior-template
ITPM-SW-101-R01CBM基于状态(On-Condition)工单(派生):断路器拒动80003000004.9%prior-template
ITPM-SW-101-C06CBM状态监测/点检(电流互感器/电压互感器故障)80003000003.0%prior-template
ITPM-SW-101-C14CBM状态监测/点检(柜体腐蚀(危险区域))80003000003.0%prior-template
ITPM-SW-101-C10CBM状态监测/点检(绝缘老化)80003000003.9%prior-template
ITPM-SW-101-C04CBM状态监测/点检(局部放电)80003000004.9%prior-template
ITPM-SW-101-P16PM保护定值校核120prior-template
ITPM-SW-101-P17PM操动机构特性测试120prior-template
ITPM-SW-101-P18PM二次回路绝缘检查120prior-template
ITPM-SW-101-P19PM逻辑防误校验120prior-template
ITPM-SW-101-P20PM红外测温巡检120prior-template
ITPM-SW-101-P21PM力矩复紧120prior-template
ITPM-SW-101-P22PM在线局放监测120prior-template
ITPM-SW-101-P23PM耐压试验120prior-template
ITPM-SW-101-P24PM机构润滑维护120prior-template
ITPM-SW-101-P25PM最低动作电压测试120prior-template
ITPM-SW-101-P26PM二次回路校验120prior-template
ITPM-SW-101-P27PM绝缘监测120prior-template
ITPM-SW-101-P28PM保护功能测试120prior-template
ITPM-SW-101-P29PM固件版本管理120prior-template
ITPM-SW-101-P30PM电弧防护评估120prior-template
ITPM-SW-101-P31PM快速保护配置120prior-template
ITPM-SW-101-P32PM绝缘电阻测试120prior-template
ITPM-SW-101-P33PM环境除湿120prior-template
ITPM-SW-101-P34PM双路控制电源120prior-template
ITPM-SW-101-P35PM蓄电池巡检120prior-template
ITPM-SW-101-P36PM接地电阻测试120prior-template
ITPM-SW-101-P37PM测温模块校准120prior-template
ITPM-SW-101-P38PM外壳防腐检查120prior-template
ITPM-SW-101-P39PM气密性试验120prior-template
ITPM-SW-101-P40PM通信冗余120prior-template
ITPM-SW-101-P41PM模块巡检120prior-template

4.1 处方与成本权衡4.1 Prescription & Cost Trade-off

成本取自 crq 参数(cp=检验成本,cf=失效纠正成本),预期风险削减为不执行该工单的年度失效概率上限近似。当前 crq 未标实测来源,统一标注 prior-template(非装置实测成本);实测数据经 ingest_measured 审批并入后转 posterior,削减值将升级为风险成本率精算(goal_planning._cost_rate_at)。Costs are drawn from crq parameters (cp = inspection cost, cf = failure correction cost); expected risk reduction approximates the upper bound of annual failure probability if the work order is not executed. Current crq has no measured source, uniformly tagged prior-template (not as-found plant cost); once measured data is approved and ingested via ingest_measured it switches to posterior, and the reduction upgrades to a risk-cost-rate actuarial value (goal_planning._cost_rate_at).

5. RCM 维修决策(策略落地)5. RCM Maintenance Decisions (Strategy Landing)

本设备 14/14 个 FM 已落 RCM 维修决策;分布:14/14 FMs have RCM decisions; distribution: PM 12 CBM 2 工程推导eng. infer

高风险 FM 的 RCM 维修决策RCM decisions for high-risk FMs
FMFM决策Decision策略Strategy推荐任务Task间隔Interval
断路器拒动PM主动维修(Scheduled)绝缘/电气试验 + 继电保护定值校核 + 操动机构特性测试高风险 1-3 月 / 中风险 6-12 月 / 低风险 检修期 (按 RBI 风险定级)
保护装置失效PM主动维修(Scheduled)绝缘/电气试验 + 继电保护定值校核 + 操动机构特性测试高风险 1-3 月 / 中风险 6-12 月 / 低风险 检修期 (按 RBI 风险定级)
内部电弧故障PM主动维修(Scheduled)绝缘/电气试验 + 继电保护定值校核 + 操动机构特性测试高风险 1-3 月 / 中风险 6-12 月 / 低风险 检修期 (按 RBI 风险定级)

ITPM 总工单 44 张,RCM 派生 0 张;KB→工单闭环已建立,供 CMMS/SAP 消费。所有决策均属工程推导(非实测台账),执行前须经设备主管确认。Total 44 ITPM work orders, 0 RCM-derived; KB→work-order closed loop established for CMMS/SAP consumption. All decisions are engineering inference (not measured field data), subject to equipment-owner confirmation before execution.

6. 完整性结论与行动6. Integrity Conclusion & Actions

MIQA 状态MIQA Status
完整性等级Integrity LevelNone / 5
上次全面检验Last Full Inspection
下次检验到期Next Inspection Due
MOC 关联MOC Link
建议优先级Recommended Priority

存在 3 个高风险 FM,建议优先安排 RBI 定点测厚与在线监测复核;对含合金部件执行 PMI 抽检。缺陷按 API 579-1 FFS 闭环。There are 3 high-risk FMs; prioritize RBI spot thickness measurement and online-monitoring review; perform PMI sampling on alloy components. Close defects per API 579-1 FFS.