本设备共 12 个失效模式(FM),其中 4 个为高风险(S≥8 或 O≥8)。 主导风险来自「逆变器故障」(S=8, O=3, AP=低)。 主要失效机理:硫酸盐化致容量衰减, 热失控链式反应, 功率器件热疲劳。 RCM 维修决策以 PM 为主(CBM 3 / PM 9 / RTF 0)。 建议优先对高风险 FM 安排 RBI 定点测厚与在线监测复核;含合金部件须执行 PMI 抽检;缺陷按 API 579-1 FFS 闭环。This equipment has 12 failure modes (FM), of which 4 are high-risk (S≥8 or O≥8). The dominant risk is '逆变器故障' (S=8, O=3, AP=低). Main failure mechanisms: 硫酸盐化致容量衰减, 热失控链式反应, 功率器件热疲劳. RCM maintenance decisions are dominated by PM (CBM 3 / PM 9 / RTF 0). Recommendation: prioritize RBI spot thickness measurement and online-monitoring review for high-risk FMs; perform PMI sampling on alloy components; close defects per API 579-1 FFS.
由结构化 KB 数据合成(compose,非大模型实时推理);所有结论可在下方章节溯源,参数仍为合成/工程估计。Synthesized from structured KB data (compose, not real-time LLM inference); all conclusions traceable in the sections below; parameters remain synthetic / engineering estimates.
| 材质Material | |
| 介质Service Fluid | |
| 设计温度/压力Design T/P | — ℃ / — MPa |
| 名义壁厚/最小允许Nominal/Min WT | — / — mm |
| 上次检验Last Inspection | |
| 损伤机理Damage Mechanisms | |
| 后果类型Consequence Type | |
| 检验有效性Inspection Effectiveness | |
| 置信度Confidence | |
| 腐蚀速率(估)Corrosion Rate (est.) |
| FMFM | SS | OO | DD | APAP | 后果Consequence | 机理Mechanism | 证据Evidence |
|---|---|---|---|---|---|---|---|
| 逆变器故障 ▸ 展开▸ expand | 8 | 3 | 4 | 低 | Operational | 功率器件热疲劳 | 2 |
| 静态开关失效 ▸ 展开▸ expand | 8 | 3 | 4 | 低 | Operational | 晶闸管失效 | 1 |
| 蓄电池后备时间不足 ▸ 展开▸ expand | 8 | 3 | 4 | 低 | Operational | 整组容量衰减 | 2 |
| 蓄电池热失控 ▸ 展开▸ expand | 8 | 2 | 4 | 低 | Safety,Operational | 热失控链式反应 | 2 |
| 蓄电池单体容量衰减 ▸ 展开▸ expand | 7 | 4 | 4 | 中 | Operational | 硫酸盐化致容量衰减 | 3 |
| 输出过载跳闸 ▸ 展开▸ expand | 7 | 4 | 3 | 中 | Operational | 过载脱扣 | 1 |
| 整流器故障 ▸ 展开▸ expand | 7 | 3 | 4 | 低 | Operational | 整流器件击穿 | 1 |
| 控制板/固件故障 ▸ 展开▸ expand | 7 | 3 | 4 | 低 | Operational | 控制器软硬件故障 | 1 |
| 冷却风扇失效 ▸ 展开▸ expand | 6 | 4 | 4 | 中 | Operational | 轴承磨损/卡滞 | 1 |
| 输入浪涌/电压骤降 ▸ 展开▸ expand | 6 | 4 | 5 | 中 | Operational | 瞬态过电压 | 1 |
| 手动/自动旁路故障 ▸ 展开▸ expand | 7 | 3 | 5 | 中 | Operational | 接触器粘连/拒动 | 1 |
| 通信中断 ▸ 展开▸ expand | 5 | 3 | 5 | 低 | Operational | 监控链路故障 | 1 |
判定:Decision: exempt — 非承压金属/结构件,API RP 578 范围外
| 工单号WO ID | 类型Type | 描述Description | 周期(月)Interval (mo) | 成本cp(元)Cost cp (¥) | 成本cf(元)Cost cf (¥) | 预期风险削减Exp. Risk Reduc. | 成本来源Cost Source |
|---|---|---|---|---|---|---|---|
| ITPM-UPS-101-C12 | CBM | 状态监测/点检(通信中断) | 8000 | 300000 | 3.9% | prior-template | |
| ITPM-UPS-101-C02 | CBM | 状态监测/点检(蓄电池热失控) | 8000 | 300000 | 2.0% | prior-template | |
| ITPM-UPS-101-C06 | CBM | 状态监测/点检(控制板/固件故障) | 8000 | 300000 | 3.9% | prior-template | |
| ITPM-UPS-101-R01 | CBM | 基于状态(On-Condition)工单(派生):蓄电池热失控 | 8000 | 300000 | 2.0% | prior-template | |
| ITPM-UPS-101-C11 | CBM | 状态监测/点检(手动/自动旁路故障) | 8000 | 300000 | 3.0% | prior-template | |
| ITPM-UPS-101-C05 | CBM | 状态监测/点检(静态开关失效) | 8000 | 300000 | 3.0% | prior-template | |
| ITPM-UPS-101-R03 | CBM | 基于状态(On-Condition)工单(派生):静态开关失效 | 8000 | 300000 | 3.0% | prior-template | |
| ITPM-UPS-101-C08 | CBM | 状态监测/点检(输入浪涌/电压骤降) | 8000 | 300000 | 4.9% | prior-template | |
| ITPM-UPS-101-C09 | CBM | 状态监测/点检(输出过载跳闸) | 8000 | 300000 | 4.9% | prior-template | |
| ITPM-UPS-101-C07 | CBM | 状态监测/点检(冷却风扇失效) | 8000 | 300000 | 5.8% | prior-template | |
| ITPM-UPS-101-C10 | CBM | 状态监测/点检(蓄电池后备时间不足) | 8000 | 300000 | 4.9% | prior-template | |
| ITPM-UPS-101-R04 | CBM | 基于状态(On-Condition)工单(派生):蓄电池后备时间不足 | 8000 | 300000 | 4.9% | prior-template | |
| ITPM-UPS-101-C04 | CBM | 状态监测/点检(整流器故障) | 8000 | 300000 | 3.9% | prior-template | |
| ITPM-UPS-101-C01 | CBM | 状态监测/点检(蓄电池单体容量衰减) | 8000 | 300000 | 7.7% | prior-template | |
| ITPM-UPS-101-C03 | CBM | 状态监测/点检(逆变器故障) | 8000 | 300000 | 4.9% | prior-template | |
| ITPM-UPS-101-R02 | CBM | 基于状态(On-Condition)工单(派生):逆变器故障 | 8000 | 300000 | 4.9% | prior-template | |
| ITPM-UPS-101-P13 | PM | 蓄电池内阻/容量测试 | 12 | 0 | — | prior-template | |
| ITPM-UPS-101-P14 | PM | 均充维护 | 12 | 0 | — | prior-template | |
| ITPM-UPS-101-P15 | PM | 充电电压整定 | 12 | 0 | — | prior-template | |
| ITPM-UPS-101-P16 | PM | 温度监测 | 12 | 0 | — | prior-template | |
| ITPM-UPS-101-P17 | PM | IGBT 温度监测 | 12 | 0 | — | prior-template | |
| ITPM-UPS-101-P18 | PM | 模块轮换 | 12 | 0 | — | prior-template | |
| ITPM-UPS-101-P19 | PM | 整流模块巡检 | 12 | 0 | — | prior-template | |
| ITPM-UPS-101-P20 | PM | 静态开关动作测试 | 12 | 0 | — | prior-template | |
| ITPM-UPS-101-P21 | PM | 固件版本管理 | 12 | 0 | — | prior-template | |
| ITPM-UPS-101-P22 | PM | 控制板冗余 | 12 | 0 | — | prior-template | |
| ITPM-UPS-101-P23 | PM | 风扇状态监测 | 12 | 0 | — | prior-template | |
| ITPM-UPS-101-P24 | PM | 备件轮换 | 12 | 0 | — | prior-template | |
| ITPM-UPS-101-P25 | PM | 浪涌保护器检查 | 12 | 0 | — | prior-template | |
| ITPM-UPS-101-P26 | PM | 负载核算 | 12 | 0 | — | prior-template | |
| ITPM-UPS-101-P27 | PM | 容量管理 | 12 | 0 | — | prior-template | |
| ITPM-UPS-101-P28 | PM | 整组放电试验 | 12 | 0 | — | prior-template | |
| ITPM-UPS-101-P29 | PM | 旁路接触器测试 | 12 | 0 | — | prior-template | |
| ITPM-UPS-101-P30 | PM | 通信冗余 | 12 | 0 | — | prior-template |
成本取自 crq 参数(cp=检验成本,cf=失效纠正成本),预期风险削减为不执行该工单的年度失效概率上限近似。当前 crq 未标实测来源,统一标注 prior-template(非装置实测成本);实测数据经 ingest_measured 审批并入后转 posterior,削减值将升级为风险成本率精算(goal_planning._cost_rate_at)。Costs are drawn from crq parameters (cp = inspection cost, cf = failure correction cost); expected risk reduction approximates the upper bound of annual failure probability if the work order is not executed. Current crq has no measured source, uniformly tagged prior-template (not as-found plant cost); once measured data is approved and ingested via ingest_measured it switches to posterior, and the reduction upgrades to a risk-cost-rate actuarial value (goal_planning._cost_rate_at).
本设备 12/12 个 FM 已落 RCM 维修决策;分布:12/12 FMs have RCM decisions; distribution: PM 9 CBM 3 工程推导eng. infer
| FMFM | 决策Decision | 策略Strategy | 推荐任务Task | 间隔Interval |
|---|---|---|---|---|
| 蓄电池热失控 | PM | 主动维修(Scheduled) | 绝缘/电气试验 + 继电保护定值校核 + 操动机构特性测试; 温度/红外热成像监测, 超温报警与根因排查 | 高风险 1-3 月 / 中风险 6-12 月 / 低风险 检修期 (按 RBI 风险定级) |
| 逆变器故障 | CBM | 视情维修(On-Condition) | 无损检测(UT/MT/PT) 监测裂纹萌生, 关键转动件定时拆检; 温度/红外热成像监测, 超温报警与根因排查 | 高风险 1-3 月 / 中风险 6-12 月 / 低风险 检修期 (按 RBI 风险定级) |
| 静态开关失效 | PM | 主动维修(Scheduled) | 绝缘/电气试验 + 继电保护定值校核 + 操动机构特性测试 | 高风险 1-3 月 / 中风险 6-12 月 / 低风险 检修期 (按 RBI 风险定级) |
| 蓄电池后备时间不足 | PM | 主动维修(Scheduled) | 功能测试/标定/校验, 按厂家与 SIL 要求周期执行 | 高风险 1-3 月 / 中风险 6-12 月 / 低风险 检修期 (按 RBI 风险定级) |
ITPM 总工单 34 张,RCM 派生 0 张;KB→工单闭环已建立,供 CMMS/SAP 消费。所有决策均属工程推导(非实测台账),执行前须经设备主管确认。Total 34 ITPM work orders, 0 RCM-derived; KB→work-order closed loop established for CMMS/SAP consumption. All decisions are engineering inference (not measured field data), subject to equipment-owner confirmation before execution.
| MIQA 状态MIQA Status | |
| 完整性等级Integrity Level | None / 5 |
| 上次全面检验Last Full Inspection | |
| 下次检验到期Next Inspection Due | |
| MOC 关联MOC Link |
存在 4 个高风险 FM,建议优先安排 RBI 定点测厚与在线监测复核;对含合金部件执行 PMI 抽检。缺陷按 API 579-1 FFS 闭环。There are 4 high-risk FMs; prioritize RBI spot thickness measurement and online-monitoring review; perform PMI sampling on alloy components. Close defects per API 579-1 FFS.