板式换热器/板换/钎焊板换 (Plate Heat Exchanger)板式换热器/板换/钎焊板换 (Plate Heat Exchanger)
⚠ ⚠ Top risk: 氯化物应力腐蚀开裂 · RPN 72 (Critical) — watch this one first at the equipment
Risk Board (all 13 · by RPN · top 6 highlighted urgent)
Shield: Safety = people/environment Production = production only
Technical mechanism/mitigation body in Chinese (red line: no fabricated MT; EN UI labels translated)
13Failure Modes
12High/Critical
8Standards
5Real Accidents
Tap any failure mode to flip to its on-site guidance
Device-level standard/accident index (8 standards / 5 accidents)
Standards (8 de-duplicated)
API 662TEMAAPI 572API 570 — Piping Inspection CodeAPI 580 — Risk-Based InspectionISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipmentGB/T 16409API RP 571
Accident Lessons (5 de-duplicated)
2010-05-I-WAcsb2010 ↗Tesoro Anacortes Refinery Heat Exchanger Rupture 2016-02-I-MScsb2016 ↗Enterprise Pascagoula 气体厂换热器热疲劳破裂(帕斯卡古拉) CN-MEM-2022-06-18CN-MEM2022 ↗上海石化'6·18'1#乙二醇装置环氧乙烷精制塔爆炸事故(2022,1 死1 伤) CSB-HONEYWELL-GEISMAR-2023csb2023 ↗Honeywell Geismar 换热器破裂致氟化氢/氯气泄漏 2013-02-I-LAcsb2013 ↗Williams Geismar Olefins Plant Reboiler Explosion
FM Traceability Cards (13)
氯化物应力腐蚀开裂RPN 72 · Critical
Failure Mechanism
氯化物应力腐蚀开裂 驱动材料退化/功能失效
How to Detect
Online monitoring · Detection rate 80% ;Re-inspect ≤every24months
Mitigation (What to Do)
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (8)
API 662TEMAAPI 572API 570 — Piping Inspection CodeAPI 580 — Risk-Based InspectionISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipmentGB/T 16409API RP 571
Lessons Learned (3)
2010-05-I-WAcsb2010Fatalities 7 · SafetyTesoro Anacortes Refinery Heat Exchanger RuptureRoot cause: Shell-side corrosion of heat exchanger not detected + design did not address shell-side integrity.Official source ↗ 2016-02-I-MScsb2016Safety/OperationalEnterprise Pascagoula 气体厂换热器热疲劳破裂(帕斯卡古拉)Root cause: BAHX 热疲劳开裂;服役寿命与热循环评估不足,PHA 未识别低温热疲劳失效Official source ↗ CN-MEM-2022-06-18CN-MEM2022Fatalities 1 · Injuries 1 · Fire/Explosion上海石化'6·18'1#乙二醇装置环氧乙烷精制塔爆炸事故(2022,1 死1 伤)Root cause: 管道 P-4507 多次违规带压堵漏(规定≤2 处实际 4 处)'带病'运行至断裂;未辨识氯离子应力腐蚀;未按变更管理;老旧装置风险排查不到位Official source ↗
均匀/局部减薄(通用减薄)RPN 54 · High
Failure Mechanism
均匀/局部减薄(通用减薄) 驱动材料退化/功能失效
How to Detect
Online monitoring · Detection rate 80% ;Interval by RBI
Mitigation (What to Do)
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (8)
API 662TEMAAPI 572API 570 — Piping Inspection CodeAPI 580 — Risk-Based InspectionISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipmentGB/T 16409API RP 571
Lessons Learned (3)
2010-05-I-WAcsb2010Fatalities 7 · SafetyTesoro Anacortes Refinery Heat Exchanger RuptureRoot cause: Shell-side corrosion of heat exchanger not detected + design did not address shell-side integrity.Official source ↗ 2013-02-I-LAcsb2013Fatalities 2 · Injuries 167 · SafetyWilliams Geismar Olefins Plant Reboiler ExplosionRoot cause: Reboiler level loss of control + inadequate overpressure protection + hot-gas bypass valve mistakenly opened.Official source ↗ CN-MEM-2022-06-18CN-MEM2022Fatalities 1 · Injuries 1 · Fire/Explosion上海石化'6·18'1#乙二醇装置环氧乙烷精制塔爆炸事故(2022,1 死1 伤)Root cause: 管道 P-4507 多次违规带压堵漏(规定≤2 处实际 4 处)'带病'运行至断裂;未辨识氯离子应力腐蚀;未按变更管理;老旧装置风险排查不到位Official source ↗