Tap any failure mode → flip to its on-site guidance (pure-CSS, no JS needed on mobile)
轴流压缩机/轴流机/主风机 (Axial Compressor)轴流压缩机/轴流机/主风机 (Axial Compressor)
⚠ ⚠ Top risk: 机械疲劳 · RPN 72 (Critical) — watch this one first at the equipment
Risk Board (all 15 · by RPN · top 6 highlighted urgent)
Shield: Safety = people/environment Production = production only
Technical mechanism/mitigation body in Chinese (red line: no fabricated MT; EN UI labels translated)
15Failure Modes
14High/Critical
9Standards
4Real Accidents
Tap any failure mode to flip to its on-site guidance
Device-level standard/accident index (9 standards / 4 accidents)
Standards (9 de-duplicated)
  • API 617
  • API 618
  • API 670
  • API 580 — Risk-Based Inspection
  • ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
  • GB/T 28821
  • API RP 571
  • ISO 10816
  • API 684
Accident Lessons (4 de-duplicated)
ARR-2023-01-KMScsb2023
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
CN-MEM-2018-11-28CN-MEM2018
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019
Enterprise Pascagoula 气体处理厂爆炸火灾
CN-MEM-2014-07-08CN-MEM2014
Qingdao Qichao Cold-storage Plant Refrigeration Compressor Liquid-ammonia Leak Accident (Jul 8)
FM Traceability Cards (15)
Generated by Reliability AI
机械疲劳RPN 72 · Critical
Failure Mechanism
机械疲劳 驱动材料退化/功能失效
How to Detect
Online monitoring · Detection rate 70% ;Re-inspect ≤every24months
Mitigation (What to Do)
  • 磁粉/超声波检测
  • 应力分析复核
  • Periodic nondestructive testing
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (9)
  • API 617
  • API 618
  • API 670
  • API 580 — Risk-Based Inspection
  • ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
  • GB/T 28821
  • API RP 571
  • ISO 10816
  • API 684
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
振动诱发疲劳RPN 72 · Critical
Failure Mechanism
振动诱发疲劳 驱动材料退化/功能失效
How to Detect
Online monitoring · Detection rate 70% ;Re-inspect ≤every24months
Mitigation (What to Do)
  • 磁粉/超声波检测
  • 应力分析复核
  • Periodic nondestructive testing
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (9)
  • API 617
  • API 618
  • API 670
  • API 580 — Risk-Based Inspection
  • ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
  • GB/T 28821
  • API RP 571
  • ISO 10816
  • API 684
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
轴承失效(磨损/剥落)RPN 54 · High
Failure Mechanism
轴承失效(磨损/剥落) 驱动材料退化/功能失效
How to Detect
Online monitoring · Detection rate 80% ;Interval by RBI
Mitigation (What to Do)
  • Periodic inspection
  • 状态监测
  • 性能评估
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (9)
  • API 617
  • API 618
  • API 670
  • API 580 — Risk-Based Inspection
  • ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
  • GB/T 28821
  • API RP 571
  • ISO 10816
  • API 684
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
密封失效RPN 54 · High
Failure Mechanism
密封失效 驱动材料退化/功能失效
How to Detect
Online monitoring · Detection rate 80% ;Interval by RBI
Mitigation (What to Do)
  • Periodic inspection
  • 状态监测
  • 性能评估
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (9)
  • API 617
  • API 618
  • API 670
  • API 580 — Risk-Based Inspection
  • ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
  • GB/T 28821
  • API RP 571
  • ISO 10816
  • API 684
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2014-07-08CN-MEM2014Injuries 1 · Toxic
Qingdao Qichao Cold-storage Plant Refrigeration Compressor Liquid-ammonia Leak Accident (Jul 8)
Root cause: Compressor components not maintained in time (gasket aging); operator error in refrigeration operation (intercooler overpressure, liquid ammonia slugs back to cylinder); non-compliant emergency response; deficient safety management and training, shutdown order not enforced.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
压缩机喘振RPN 54 · High
Failure Mechanism
压缩机喘振 驱动材料退化/功能失效
How to Detect
Online monitoring · Detection rate 80% ;Interval by RBI
Mitigation (What to Do)
  • Periodic inspection
  • 状态监测
  • 性能评估
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (9)
  • API 617
  • API 618
  • API 670
  • API 580 — Risk-Based Inspection
  • ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
  • GB/T 28821
  • API RP 571
  • ISO 10816
  • API 684
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
润滑失效RPN 54 · High
Failure Mechanism
润滑失效 驱动材料退化/功能失效
How to Detect
Online monitoring · Detection rate 80% ;Interval by RBI
Mitigation (What to Do)
  • Periodic inspection
  • 状态监测
  • 性能评估
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (9)
  • API 617
  • API 618
  • API 670
  • API 580 — Risk-Based Inspection
  • ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
  • GB/T 28821
  • API RP 571
  • ISO 10816
  • API 684
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
不对中RPN 54 · High
Failure Mechanism
不对中 驱动材料退化/功能失效
How to Detect
Online monitoring · Detection rate 80% ;Interval by RBI
Mitigation (What to Do)
  • Periodic inspection
  • 状态监测
  • 性能评估
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (9)
  • API 617
  • API 618
  • API 670
  • API 580 — Risk-Based Inspection
  • ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
  • GB/T 28821
  • API RP 571
  • ISO 10816
  • API 684
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
转子不平衡RPN 54 · High
Failure Mechanism
转子不平衡 驱动材料退化/功能失效
How to Detect
Online monitoring · Detection rate 80% ;Interval by RBI
Mitigation (What to Do)
  • Periodic inspection
  • 状态监测
  • 性能评估
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (9)
  • API 617
  • API 618
  • API 670
  • API 580 — Risk-Based Inspection
  • ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
  • GB/T 28821
  • API RP 571
  • ISO 10816
  • API 684
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
叶轮/叶片磨损RPN 54 · High
Failure Mechanism
叶轮/叶片磨损 驱动材料退化/功能失效
How to Detect
Online monitoring · Detection rate 80% ;Interval by RBI
Mitigation (What to Do)
  • Periodic inspection
  • 状态监测
  • 性能评估
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (9)
  • API 617
  • API 618
  • API 670
  • API 580 — Risk-Based Inspection
  • ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
  • GB/T 28821
  • API RP 571
  • ISO 10816
  • API 684
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
冲蚀/冲刷腐蚀RPN 54 · High
Failure Mechanism
冲蚀/冲刷腐蚀 驱动材料退化/功能失效
How to Detect
Online monitoring · Detection rate 80% ;Interval by RBI
Mitigation (What to Do)
  • 壁厚测量(UT)
  • 目视/内窥镜检查
  • 腐蚀速率监测
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (9)
  • API 617
  • API 618
  • API 670
  • API 580 — Risk-Based Inspection
  • ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
  • GB/T 28821
  • API RP 571
  • ISO 10816
  • API 684
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
均匀/局部减薄(通用减薄)RPN 54 · High
Failure Mechanism
均匀/局部减薄(通用减薄) 驱动材料退化/功能失效
How to Detect
Online monitoring · Detection rate 80% ;Interval by RBI
Mitigation (What to Do)
  • 壁厚测量(UT)
  • 目视/内窥镜检查
  • 腐蚀速率监测
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (9)
  • API 617
  • API 618
  • API 670
  • API 580 — Risk-Based Inspection
  • ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
  • GB/T 28821
  • API RP 571
  • ISO 10816
  • API 684
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
联轴器失效RPN 54 · High
Failure Mechanism
联轴器失效 驱动材料退化/功能失效
How to Detect
Online monitoring · Detection rate 80% ;Interval by RBI
Mitigation (What to Do)
  • Periodic inspection
  • 状态监测
  • 性能评估
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (9)
  • API 617
  • API 618
  • API 670
  • API 580 — Risk-Based Inspection
  • ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
  • GB/T 28821
  • API RP 571
  • ISO 10816
  • API 684
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
大气腐蚀RPN 54 · High
Failure Mechanism
大气腐蚀 驱动材料退化/功能失效
How to Detect
Online monitoring · Detection rate 80% ;Interval by RBI
Mitigation (What to Do)
  • 壁厚测量(UT)
  • 目视/内窥镜检查
  • 腐蚀速率监测
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (9)
  • API 617
  • API 618
  • API 670
  • API 580 — Risk-Based Inspection
  • ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
  • GB/T 28821
  • API RP 571
  • ISO 10816
  • API 684
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
电偶腐蚀RPN 54 · High
Failure Mechanism
电偶腐蚀 驱动材料退化/功能失效
How to Detect
Online monitoring · Detection rate 80% ;Interval by RBI
Mitigation (What to Do)
  • 壁厚测量(UT)
  • 目视/内窥镜检查
  • 腐蚀速率监测
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (9)
  • API 617
  • API 618
  • API 670
  • API 580 — Risk-Based Inspection
  • ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
  • GB/T 28821
  • API RP 571
  • ISO 10816
  • API 684
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
结垢/堵塞RPN 45 · Medium
Failure Mechanism
结垢/堵塞 驱动材料退化/功能失效
How to Detect
Online monitoring · Detection rate 60% ;Interval by RBI
Mitigation (What to Do)
  • 监测压差/流量
  • 定期清洗/化学清洗
  • 检查堵塞物
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (9)
  • API 617
  • API 618
  • API 670
  • API 580 — Risk-Based Inspection
  • ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
  • GB/T 28821
  • API RP 571
  • ISO 10816
  • API 684
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗