Uninterruptible Power Supply (UPS)Uninterruptible Power Supply (UPS)
⚠ ⚠ Top risk: 输入浪涌/电压骤降 · RPN 120 (High) — watch this one first at the equipment
Risk Board (all 12 · by RPN · top 6 highlighted urgent)
Shield: Safety = people/environment Production = production only
Technical mechanism/mitigation body in Chinese (red line: no fabricated MT; EN UI labels translated)
12Failure Modes
11High/Critical
4Standards
2Real Accidents
Tap any failure mode to flip to its on-site guidance
Device-level standard/accident index (4 standards / 2 accidents)
Standards (4 de-duplicated)
IEC 62040-3IEEE 450IEEE 1188IEC 62040-1
Accident Lessons (2 de-duplicated)
NUREG-LER-1997-032-INDIANPOINT3NRC1997 ↗Indian Point 3 号机 480V 安全母线因 RHR 泵断路器拒动而不可用(1997) NUREG-LER-1998-002-BROWNSFERRYNRC1998 ↗Browns Ferry 3 号机 480V 停役盘备用馈线断路器拒合导致母线瞬时失电(1998)
FM Traceability Cards (12)
蓄电池后备时间不足RPN 96 · Critical
Failure Mechanism
整组容量低于阈值致支撑时间不足
How to Detect
Online monitoring · Detection rate 80% ;Re-inspect ≤every24months
Mitigation (What to Do)
RCM Strategy
PMScheduled (Proactive) Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
Lessons Learned (2)
NUREG-LER-1997-032-INDIANPOINT3NRC1997OperationalIndian Point 3 号机 480V 安全母线因 RHR 泵断路器拒动而不可用(1997)Root cause: 断路器机构关键枢轴连接缺乏润滑导致卡涩拒动;同类 DS-416 断路器存在潜在共因退化Official source ↗ NUREG-LER-1998-002-BROWNSFERRYNRC1998OperationalBrowns Ferry 3 号机 480V 停役盘备用馈线断路器拒合导致母线瞬时失电(1998)Root cause: 断路器位置开关联动触点被一根错位导线干扰无法正常闭合;根本因为导线布线不当及开关盖板拆装错误Official source ↗