Superheater Tube Rupture
BL-201A · Boiler
Related equipment → BL-201A
0.82Source conf.
0.85Evidence conf.
OHEISO 14224 mode
1Failure Mechanism

Function:将饱和蒸汽过热

Failure cause:蒸汽温度控制异常导致超温;管内结垢或异物堵塞;材料老化或焊接缺陷

Damage mechanism:长期/短期过热(overheat, creep-assisted)+ 结垢/材料老化/焊接缺陷 → 过热器爆管

2Source Basis (where this FM comes from)
OPC Ontology KBCSB Accident DBQuant benchmark

Source confidence 0.82: this FM is derived from the ontology KB and cross-validated by OPC Ontology KB·CSB Accident DB·Quant benchmark.

3Evidence Chain (supporting basis)
Evidence text:Material characteristics and failure prediction of SA213 Superheater Boiler tube (2024); Failure Investigation of Superheater Tubes in Utility Boiler (2025)
Evidence ref code:S2:b2237d401aa42ae2
Evidence conf.:0.85 · Evidence source:Industry consensus
⚠ The evidence ref code S2:b2237d401aa42ae2 is an internal index code of this KB, for tracing back to the offline curated corpus; it is not a public doi.org link, hence no hyperlink is provided.
Governing standards (evidence):
  • std:ASME-BPVC-I — ASME BPVC Section I — Rules for Construction of Power Boilers · 锅筒/受热面建造与检验规则(PG-19 等)
  • std:API-571 — API 571 — Damage Mechanisms Affecting Fixed Equipment · 损伤机理归类框架
  • std:DL-T-939 — DL/T 939-2016 — 火力发电厂锅炉受热面管事故分析与预防 · 受热面管事故预防
  • std:API-579 — API 579-1/ASME FFS-1 — Fitness-For-Service · 剩余寿命/FFS(蠕变 Omega、Part 10)
4Related Real Accidents (traceable to accident cards)

This FM is recorded in 2 real accident investigation(s); tap the report no. to open the corresponding accident lesson card.

5Applicable Standards & Clauses
API 580GB/T 7826-2012ISO 14224:2016SAE JA1011_202411

Standard clause references (19):

GB/T 7826-2012GB/T 27921-2011GB/T 44958-2024GB/T 4888-2008GB/T 29639-2020AQ/T 3034-2022API 581API 580API 510API 571API 579-1/ASME FFS-1API 754API 576API 689API 755ISO 14224:2016ISO 20815:2018IEC 61511:2016ISO 31000:2018
6Derived Analysis (seeded from this FM)
9/4/3FMEA Sev/Occ/Det
0.34RBI λ
0.8Monitor pdet
4 月Insp. int.

Current tasks:每日监测蒸汽温度及趋势分析 | 每半年进行壁厚测量和金相检查 | 每月检查管壁温度监测数据

RCFA incident:BL-201A 发生过热器爆管,严重程度 9,后果类型 Safety/Environmental

7RCM Maintenance Decision (strategy landing)
CBMOn-Condition Maintenance
Recommended task按压差/效率监测设定清洗周期 + 过滤/防堵维护; 温度/红外热成像监测, 超温报警与根因排查; 标定/零点-跨度校验 + SIL Proof test + 阀门行程试验 + 变更管理; 蠕变测量/金相监测, 按剩余寿命管理
Suggested intervalHigh risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Decision basis机理类别=creep; fouling; instrument; overheat
Governing standards
API 530API 571API 579ASME IIIGB/T 21109IEC 61511ISA 84厂家规范
⚠ This decision is engineering-inferred by RCM logic from the damage mechanism / root cause / failure cause — it is not derived from measured site history. Confirm with the equipment owner and process before execution.
⚠ 本卡技术正文(功能 / 致因 / 损伤机理 / RCFA 叙事)保留中文原文——依可信 AI 红线,自由技术文本不自动机翻、不编造英文译文。UI、设备类型、FM 名、ISO 码、标准号均为英文。
FM fm_6 · Data from OPC KB and whitelisted public sources, compiled by Reliability AI for reliability demonstration only. Evidence ref codes are internal indices, not public DOIs.