FM Traceability Card · trace the source basis (tap links to trace back)
← Back to KB navigation
Equipment BL-201A FM tube_rupture ISO 14224 mode OTH Other Source OPC Ontology KB
Furnace Tube Rupture
BL-201A · Boiler
Related equipment → BL-201A
0.82Source conf.
0.85Evidence conf.
OTHISO 14224 mode
1Failure Mechanism

Function:炉膛辐射吸热

Failure cause:管内结垢或异物堵塞导致传热恶化;火焰偏烧或热负荷不均;管材缺陷或焊接质量问题

Damage mechanism:管内结垢/异物堵塞 → 传热恶化 → 短期过热(short-term overheat)+ 管材/焊接缺陷

2Source Basis (where this FM comes from)
OPC Ontology KBCSB Accident DBQuant benchmark

Source confidence 0.82: this FM is derived from the ontology KB and cross-validated by OPC Ontology KB·CSB Accident DB·Quant benchmark.

3Evidence Chain (supporting basis)
Evidence text:None
Evidence conf.:0.85 · Evidence source:Industry consensus
Governing standards (evidence):
  • std:ASME-BPVC-I — ASME BPVC Section I — Rules for Construction of Power Boilers · 锅筒/受热面建造与检验规则(PG-19 等)
  • std:API-571 — API 571 — Damage Mechanisms Affecting Fixed Equipment · 损伤机理归类框架
  • std:DL-T-939 — DL/T 939-2016 — 火力发电厂锅炉受热面管事故分析与预防 · 受热面管事故预防
  • std:GB-T-16507 — GB/T 16507 — 水管锅炉 · 中国水管锅炉标准
4Related Real Accidents (traceable to accident cards)

This FM is recorded in 2 real accident investigation(s); tap the report no. to open the corresponding accident lesson card.

5Applicable Standards & Clauses
API 580GB/T 7826-2012ISO 14224:2016SAE JA1011_202411

Standard clause references (19):

GB/T 7826-2012GB/T 27921-2011GB/T 44958-2024GB/T 4888-2008GB/T 29639-2020AQ/T 3034-2022API 581API 580API 510API 571API 579-1/ASME FFS-1API 754API 576API 689API 755ISO 14224:2016ISO 20815:2018IEC 61511:2016ISO 31000:2018
6Derived Analysis (seeded from this FM)
10/4/3FMEA Sev/Occ/Det
0.34RBI λ
0.8Monitor pdet
4 月Insp. int.

Current tasks:定期检查 | 振动监测 | 建立SIL评估(按IEC 61511)确定安全完整性等级 | 每1个月执行proof test验证保护层有效性

RCFA incident:BL-201A 发生炉管爆管 (Tube Rupture),严重程度 10,后果类型 Safety/Environmental

7RCM Maintenance Decision (strategy landing)
CBMOn-Condition Maintenance
Recommended task按压差/效率监测设定清洗周期 + 过滤/防堵维护; 无损检测(UT/MT/PT) 监测裂纹萌生, 关键转动件定时拆检; 振动频谱分析 + 动平衡 + 激光对中, 状态监测趋势管理; 无损检测(UT/VT/MT/PT), 按 API 581 RBI 风险定级设定检验间隔; 温度/红外热成像监测, 超温报警与根因排查
Suggested intervalHigh risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Decision basis机理类别=corrosion; fatigue; fouling; overheat; vibration
Governing standards
API 530API 570API 571API 579API 581API 612API 670API 684ASME VIIIISO 10816厂家规范
⚠ This decision is engineering-inferred by RCM logic from the damage mechanism / root cause / failure cause — it is not derived from measured site history. Confirm with the equipment owner and process before execution.
⚠ 本卡技术正文(功能 / 致因 / 损伤机理 / RCFA 叙事)保留中文原文——依可信 AI 红线,自由技术文本不自动机翻、不编造英文译文。UI、设备类型、FM 名、ISO 码、标准号均为英文。
FM tube_rupture · Data from OPC KB and whitelisted public sources, compiled by Reliability AI for reliability demonstration only. Evidence ref codes are internal indices, not public DOIs.