FM Traceability Card · trace the source basis (tap links to trace back)
← Back to KB navigation
Equipment SC-101 FM capacity_control_malfunction ISO 14224 mode Screw capacity control Screw capacity control Source synthetic + standards-based engineering estimate (ISO 14224 / API / IEC 61511 框架归类)
气量调节失灵
SC-101 · Screw Compressor
Related equipment → SC-101
0.82Source conf.
Evidence conf.
Screw capacity controlISO 14224 mode
1Failure Mechanism

Function:匹配负荷需求

Failure cause:滑阀/旁通阀故障

Damage mechanism:容量调节失效致排气量失控(API 619 调节系统)

2Source Basis (where this FM comes from)
synthetic + standards-based engineering estimate (ISO 14224 / API / IEC 61511 框架归类)

Source confidence 0.82: this FM is derived from the ontology KB and cross-validated by synthetic + standards-based engineering estimate (ISO 14224 / API / IEC 61511 框架归类).

3Evidence Chain (supporting basis)
This FM has no offline curated evidence text; it is derived from the ontology KB and cross-validated by the listed standard clauses and related accident investigations.
Governing standards (evidence):
  • std:API 619 — Rotary-type Positive-displacement Compressors · 机理级工程估计,非实测;引用 governing standard 作为分类出处
4Related Real Accidents (traceable to accident cards)

This FM is recorded in 3 real accident investigation(s); tap the report no. to open the corresponding accident lesson card.

5Applicable Standards & Clauses
API 619API 617ISO 14224:2016GB/T 6075ISO 13372API 580API 571GB/T 7826-2012SAE JA1011_202411

No separate clause reference.

6Derived Analysis (seeded from this FM)
5/3/3FMEA Sev/Occ/Det
0.15RBI λ
0.8Monitor pdet
6 月Insp. int.

Current tasks:调节阀校准 | 负荷响应测试

RCFA incident:气量调节失灵:滑阀/旁通阀故障,后果类型 Operational,严重度 5

7RCM Maintenance Decision (strategy landing)
PMScheduled (Proactive) Maintenance
Recommended task标定/零点-跨度校验 + SIL Proof test + 阀门行程试验 + 变更管理
Suggested intervalHigh risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Decision basis机理类别=instrument
Governing standards
GB/T 21109IEC 61511ISA 84
⚠ This decision is engineering-inferred by RCM logic from the damage mechanism / root cause / failure cause — it is not derived from measured site history. Confirm with the equipment owner and process before execution.
⚠ 本卡技术正文(功能 / 致因 / 损伤机理 / RCFA 叙事)保留中文原文——依可信 AI 红线,自由技术文本不自动机翻、不编造英文译文。UI、设备类型、FM 名、ISO 码、标准号均为英文。
FM capacity_control_malfunction · Data from OPC KB and whitelisted public sources, compiled by Reliability AI for reliability demonstration only. Evidence ref codes are internal indices, not public DOIs.