FM Traceability Card · trace the source basis (tap links to trace back)
← Back to KB navigation
Equipment TX-101 FM core_ground_fault_hotspot ISO 14224 mode Core multiple ground / hotspot Core multiple ground / hotspot Source synthetic + standards-based engineering estimate (ISO 14224 / IEC 61800 / IEEE C57 框架归类)
铁芯多点接地/过热
TX-101 · Power Transformer
Related equipment → TX-101
0.82Source conf.
Evidence conf.
Core multiple ground / hotspotISO 14224 mode
1Failure Mechanism

Function:提供磁路

Failure cause:铁芯叠片间绝缘损坏形成环流多点接地,局部过热

Damage mechanism:铁芯叠片间绝缘损坏形成环流多点接地,局部过热导致叠片烧熔

2Source Basis (where this FM comes from)
synthetic + standards-based engineering estimate (ISO 14224 / IEC 61800 / IEEE C57 框架归类)

Source confidence 0.82: this FM is derived from the ontology KB and cross-validated by synthetic + standards-based engineering estimate (ISO 14224 / IEC 61800 / IEEE C57 框架归类).

3Evidence Chain (supporting basis)
This FM has no offline curated evidence text; it is derived from the ontology KB and cross-validated by the listed standard clauses and related accident investigations.
Governing standards (evidence):
  • std:IEEE C57.104 — IEEE Guide for the Interpretation of Gases Generated in Oil-Immersed Transformers · 机理级工程估计,非实测;引用 governing standard 作为分类出处
  • std:IEC 60076 — Power transformers · 机理级工程估计,非实测;引用 governing standard 作为分类出处
4Related Real Accidents (traceable to accident cards)

This FM is recorded in 2 real accident investigation(s); tap the report no. to open the corresponding accident lesson card.

5Applicable Standards & Clauses
IEEE C57.104IEC 60076

No separate clause reference.

6Derived Analysis (seeded from this FM)
6/2/3FMEA Sev/Occ/Det
0.03RBI λ
0.7Monitor pdet
12 月Insp. int.

Current tasks:铁芯接地电流监测 | 油色谱监控

RCFA incident:铁芯多点接地/过热:铁芯叠片间绝缘损坏形成环流多点接地,局部过热,后果类型 Operational,严重度 6

7RCM Maintenance Decision (strategy landing)
PMScheduled (Proactive) Maintenance
Recommended task绝缘/电气试验 + 继电保护定值校核 + 操动机构特性测试; 温度/红外热成像监测, 超温报警与根因排查; 标定/零点-跨度校验 + SIL Proof test + 阀门行程试验 + 变更管理
Suggested intervalHigh risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Decision basis机理类别=electrical; instrument; overheat
Governing standards
API 530GB/T 14285GB/T 21109IEC 60034IEC 61511IEEE C57ISA 84厂家规范
⚠ This decision is engineering-inferred by RCM logic from the damage mechanism / root cause / failure cause — it is not derived from measured site history. Confirm with the equipment owner and process before execution.
⚠ 本卡技术正文(功能 / 致因 / 损伤机理 / RCFA 叙事)保留中文原文——依可信 AI 红线,自由技术文本不自动机翻、不编造英文译文。UI、设备类型、FM 名、ISO 码、标准号均为英文。
FM core_ground_fault_hotspot · Data from OPC KB and whitelisted public sources, compiled by Reliability AI for reliability demonstration only. Evidence ref codes are internal indices, not public DOIs.