Instrumentation & Safety Instrumented System (SIS)Instrumentation & Safety Instrumented System (SIS)
⚠ ⚠ Top risk: 传感器漂移/校准失效 · RPN 96 (High) — watch this one first at the equipment
Risk Board (all 16 · by RPN · top 6 highlighted urgent)
Shield: Safety = people/environment Production = production only
Technical mechanism/mitigation body in Chinese (red line: no fabricated MT; EN UI labels translated)
16Failure Modes
12High/Critical
11Standards
1Real Accidents
Tap any failure mode to flip to its on-site guidance
Device-level standard/accident index (11 standards / 1 accidents)
Standards (11 de-duplicated)
IEC 61511 — Functional safety — Safety instrumented systems for the process industry sectorGB/T 21109GB/T 20438IEC 61508ISA 84.00.01ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipmentAPI 580 — Risk-Based InspectionGB/T 7826-2012SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance ProcessesGB/T 27921-2023IEC 62443
Accident Lessons (1 de-duplicated)
CSB-ITC-DEERPARK-2019CSB2019 ↗CSB ITC Deer Park 2019 储罐区火灾:缺乏可燃/气体监测与远程隔离阀(2023 终报)
FM Traceability Cards (16)
拒动(SIS 该动不动)RPN 54 · Critical
Failure Mechanism
传感器/逻辑/终阀任一失效
How to Detect
Online monitoring · Detection rate 90% ;Interval by RBI
Mitigation (What to Do)
RCM Strategy
PMScheduled (Proactive) Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (10)
IEC 61511 — Functional safety — Safety instrumented systems for the process industry sectorGB/T 21109GB/T 20438IEC 61508ISA 84.00.01ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipmentAPI 580 — Risk-Based InspectionGB/T 7826-2012SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance ProcessesGB/T 27921-2023
Lessons Learned (1)
CSB-ITC-DEERPARK-2019CSB2019FireCSB ITC Deer Park 2019 储罐区火灾:缺乏可燃/气体监测与远程隔离阀(2023 终报)Root cause: ITC 缺乏监测泵失效的报警器/气体检测系统,且无可远程操作的紧急隔离阀,导致泄漏未能及时探测与切断Official source ↗
逻辑错误(SIS 组态)RPN 48 · Critical
Failure Mechanism
组态错误或变更失控
How to Detect
Online monitoring · Detection rate 85% ;Interval by RBI
Mitigation (What to Do)
RCM Strategy
PMScheduled (Proactive) Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (10)
IEC 61511 — Functional safety — Safety instrumented systems for the process industry sectorGB/T 21109GB/T 20438IEC 61508ISA 84.00.01ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipmentAPI 580 — Risk-Based InspectionGB/T 7826-2012SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance ProcessesGB/T 27921-2023
Lessons Learned (1)
CSB-ITC-DEERPARK-2019CSB2019FireCSB ITC Deer Park 2019 储罐区火灾:缺乏可燃/气体监测与远程隔离阀(2023 终报)Root cause: ITC 缺乏监测泵失效的报警器/气体检测系统,且无可远程操作的紧急隔离阀,导致泄漏未能及时探测与切断Official source ↗
误跳闸(SIS 误动)RPN 45 · Medium
Failure Mechanism
元件随机失效/干扰
How to Detect
Online monitoring · Detection rate 85% ;Interval by RBI
Mitigation (What to Do)
RCM Strategy
PMScheduled (Proactive) Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (10)
IEC 61511 — Functional safety — Safety instrumented systems for the process industry sectorGB/T 21109GB/T 20438IEC 61508ISA 84.00.01ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipmentAPI 580 — Risk-Based InspectionGB/T 7826-2012SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance ProcessesGB/T 27921-2023
Lessons Learned (1)
CSB-ITC-DEERPARK-2019CSB2019FireCSB ITC Deer Park 2019 储罐区火灾:缺乏可燃/气体监测与远程隔离阀(2023 终报)Root cause: ITC 缺乏监测泵失效的报警器/气体检测系统,且无可远程操作的紧急隔离阀,导致泄漏未能及时探测与切断Official source ↗
网络安全失陷(配置篡改)RPN 32 · Critical
Failure Mechanism
未授权访问/配置篡改
How to Detect
Online monitoring · Detection rate 80% ;Interval by RBI
Mitigation (What to Do)
RCM Strategy
PMScheduled (Proactive) Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (11)
IEC 61511 — Functional safety — Safety instrumented systems for the process industry sectorGB/T 21109GB/T 20438IEC 61508ISA 84.00.01ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipmentAPI 580 — Risk-Based InspectionGB/T 7826-2012SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance ProcessesGB/T 27921-2023IEC 62443
Lessons Learned (1)
CSB-ITC-DEERPARK-2019CSB2019FireCSB ITC Deer Park 2019 储罐区火灾:缺乏可燃/气体监测与远程隔离阀(2023 终报)Root cause: ITC 缺乏监测泵失效的报警器/气体检测系统,且无可远程操作的紧急隔离阀,导致泄漏未能及时探测与切断Official source ↗