← Back to KB navigation
Equipment MVR-01
FM COMP-C1-FM2
ISO 14224 mode SYN SYN
Source Synthetic
结垢转子不平衡
MVR-01 · Mechanical Vapor Recompression (MVR) System
Related equipment → MVR-01
0.65Source conf.
—Evidence conf.
SYNISO 14224 mode
1Failure Mechanism
Function:维持转速/平衡
Failure cause:介质沉积
Damage mechanism:沉积致动不平衡 (Deposit-induced Unbalance / Fouling)
2Source Basis (where this FM comes from)
Synthetic
Source confidence 0.65: this FM is derived from the ontology KB and cross-validated by Synthetic.
3Evidence Chain (supporting basis)
This FM has no offline curated evidence text; it is derived from the ontology KB and cross-validated by the listed standard clauses and related accident investigations.
Governing standards (evidence):ima://7458030677405755/word_11035ae55c1b08ddb9e6d8bfbece61fe_c34878de0ef99baefb229cbae10a3b8b7458030677405755 — ITP-9 Skidded Equipment(杜邦制造质量检验测试计划)
4Related Real Accidents (traceable to accident cards)
This FM is recorded in 3 real accident investigation(s); tap the report no. to open the corresponding accident lesson card.
5Applicable Standards & Clauses
GB/T 7826-2012API 617
No separate clause reference.
6Derived Analysis (seeded from this FM)
6/5/4FMEA Sev/Occ/Det
0.25RBI λ
—Monitor pdet
12 月Insp. int.
Current tasks:振动分析(ISO 10816) + 转子动平衡 + 结垢清理 + 进出口滤网检查
7RCM Maintenance Decision (strategy landing)
CBMOn-Condition Maintenance
Recommended task绝缘/电气试验 + 继电保护定值校核 + 操动机构特性测试; 振动频谱分析 + 动平衡 + 激光对中, 状态监测趋势管理; 按压差/效率监测设定清洗周期 + 过滤/防堵维护
Suggested intervalHigh risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Decision basis机理类别=electrical; fouling; vibration
Governing standardsAPI 571API 670API 684GB/T 14285IEC 60034IEEE C57ISO 10816厂家规范
⚠ This decision is engineering-inferred by RCM logic from the damage mechanism / root cause / failure cause — it is not derived from measured site history. Confirm with the equipment owner and process before execution.
⚠ 本卡技术正文(功能 / 致因 / 损伤机理 / RCFA 叙事)保留中文原文——依可信 AI 红线,自由技术文本不自动机翻、不编造英文译文。UI、设备类型、FM 名、ISO 码、标准号均为英文。