Tap any failure mode → flip to its on-site guidance (pure-CSS, no JS needed on mobile)
Mechanical Vapor Recompression (MVR) SystemMechanical Vapor Recompression (MVR) System
⚠ ⚠ Top risk: 分布不均→干壁过热 · RPN 150 (High) — watch this one first at the equipment
Risk Board (all 41 · by RPN · top 6 highlighted urgent)
Shield: Safety = people/environment Production = production only
Technical mechanism/mitigation body in Chinese (red line: no fabricated MT; EN UI labels translated)
41Failure Modes
18High/Critical
8Standards
14Real Accidents
Tap any failure mode to flip to its on-site guidance
Device-level standard/accident index (8 standards / 14 accidents)
Standards (8 de-duplicated)
  • GB/T 7826-2012
  • API 660
  • API 617
  • API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
  • API 610
  • GB/T 21109
  • GB/T 11348
  • API 550
Accident Lessons (14 de-duplicated)
ARR-2023-01-KMScsb2023
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
CN-MEM-2018-11-28CN-MEM2018
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019
Enterprise Pascagoula 气体处理厂爆炸火灾
CSB-EXXON-BATONROUGE-2017CSB2017
ExxonMobil Baton Rouge 炼厂化学品释放火灾
CSB-MILLARD-2015CSB2015
Millard Refrigerated 氨释放
CN-MEM-2026-03-28CN-MEM2026
Sichuan Yingda Lithium Battery Materials Co.: MVR System Secondary Separator Drain-port Scald Accident (Mar 28)
CSB-CUISINE-AMMONIA-2024csb2024
Cuisine Solutions 氨制冷系统泄漏
CN-MEM-2014-07-08CN-MEM2014
Qingdao Qichao Cold-storage Plant Refrigeration Compressor Liquid-ammonia Leak Accident (Jul 8)
2019-03-I-TXcsb2019
Intercontinental Terminals Company (ITC) Deer Park 罐区循环泵失效火灾
NUREG-LER-2011-003-BRUNSWICKNRC2011
R.E. Ginna Nuclear Plant: Turbine Lube-oil Piping Fatigue Rupture Causing Reactor Trip
NUREG-LER-2005-012-01NUREG2005
Kewaunee 余热排出泵(RHR)不可用事件(LER 2005-012-01)
NUREG-LER-2021-001-00-GINNUREG2021
R.E. Ginna 辅助给水泵绕组失效(LER 2021-001-00)
2010-06-I-GOMcsb2010
Macondo / Deepwater Horizon Blowout
NUREG-LER-2022-001NUREG2022
Susquehanna 1 号机 主蒸汽隔离阀阀座磨损泄漏
FM Traceability Cards (41)
Generated by Reliability AI
分布不均→干壁过热RPN 150 · High
Failure Mechanism
分布器设计、液位失控
How to Detect
Detection N/A ;Re-inspect ≤every6months
Mitigation (What to Do)
  • 布液均匀性检查
  • 液位联锁校验
  • 壁温监测(热电偶)
  • 分布器喷嘴通堵检查
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • API 660
Lessons Learned (5)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
CSB-EXXON-BATONROUGE-2017CSB2017Injuries 4 · Fire/Safety
ExxonMobil Baton Rouge 炼厂化学品释放火灾
Root cause: 烷基化单元工艺管道/压缩机密封失效,释放后点火
Official source ↗
CSB-MILLARD-2015CSB2015Toxic
Millard Refrigerated 氨释放
Root cause: 氨制冷系统机械密封/容器完整性不足(跨行业映射至压缩机/压力容器)
Official source ↗
除沫器堵塞→蒸汽带液RPN 140 · High
Failure Mechanism
雾沫夹带、结垢
How to Detect
Detection N/A ;Re-inspect ≤every12months
Mitigation (What to Do)
  • 除沫器压差监测
  • 定期拆洗
  • 二次蒸汽雾沫夹带检测
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • API 617
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CN-MEM-2026-03-28CN-MEM2026Fatalities 1 · Physical
Sichuan Yingda Lithium Battery Materials Co.: MVR System Secondary Separator Drain-port Scald Accident (Mar 28)
Root cause: No safe-operation management system or procedure for secondary-separator flush work (first-time task); inadequate training (wrong assessment of high-temperature / work-at-height risks); inadequate hazard investigation (residual hot water, unqualified work-at-height personnel, unstable scaffolding).
Official source ↗
湿蒸汽冲蚀/腐蚀RPN 140 · High
Failure Mechanism
二次蒸汽带液、颗粒
How to Detect
Detection N/A ;Re-inspect ≤every12months
Mitigation (What to Do)
  • 叶轮/转子 VT 检查
  • 二次蒸汽带液(雾沫)监测
  • 叶片厚度 UT
  • 材质/硬度评估
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • API 617
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CN-MEM-2026-03-28CN-MEM2026Fatalities 1 · Physical
Sichuan Yingda Lithium Battery Materials Co.: MVR System Secondary Separator Drain-port Scald Accident (Mar 28)
Root cause: No safe-operation management system or procedure for secondary-separator flush work (first-time task); inadequate training (wrong assessment of high-temperature / work-at-height risks); inadequate hazard investigation (residual hot water, unqualified work-at-height personnel, unstable scaffolding).
Official source ↗
管内结垢/结疤传热恶化RPN 120 · Medium
Failure Mechanism
水质硬度、悬浮物
How to Detect
Detection N/A ;Re-inspect ≤every12months
Mitigation (What to Do)
  • 换热端差(ΔT)与传热效率监测
  • 定期化学清洗(CIP)
  • 进水硬度/悬浮物预处理监控
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • API 660
Lessons Learned (5)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
CSB-EXXON-BATONROUGE-2017CSB2017Injuries 4 · Fire/Safety
ExxonMobil Baton Rouge 炼厂化学品释放火灾
Root cause: 烷基化单元工艺管道/压缩机密封失效,释放后点火
Official source ↗
CSB-MILLARD-2015CSB2015Toxic
Millard Refrigerated 氨释放
Root cause: 氨制冷系统机械密封/容器完整性不足(跨行业映射至压缩机/压力容器)
Official source ↗
结垢转子不平衡RPN 120 · High
Failure Mechanism
介质沉积
How to Detect
Detection N/A ;Re-inspect ≤every12months
Mitigation (What to Do)
  • 振动分析(ISO 10816)
  • Rotor dynamic balancing
  • 结垢清理
  • 进出口滤网检查
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • API 617
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CN-MEM-2026-03-28CN-MEM2026Fatalities 1 · Physical
Sichuan Yingda Lithium Battery Materials Co.: MVR System Secondary Separator Drain-port Scald Accident (Mar 28)
Root cause: No safe-operation management system or procedure for secondary-separator flush work (first-time task); inadequate training (wrong assessment of high-temperature / work-at-height risks); inadequate hazard investigation (residual hot water, unqualified work-at-height personnel, unstable scaffolding).
Official source ↗
Blade Fatigue CrackRPN 120 · Critical
Failure Mechanism
交变应力/共振
How to Detect
Detection N/A ;Re-inspect ≤every12months
Mitigation (What to Do)
  • 叶片 PT/荧光检测
  • 振动频谱分析(避开共振转速)
  • 动平衡
  • 应力/模态核算
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • API 617
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CN-MEM-2026-03-28CN-MEM2026Fatalities 1 · Physical
Sichuan Yingda Lithium Battery Materials Co.: MVR System Secondary Separator Drain-port Scald Accident (Mar 28)
Root cause: No safe-operation management system or procedure for secondary-separator flush work (first-time task); inadequate training (wrong assessment of high-temperature / work-at-height risks); inadequate hazard investigation (residual hot water, unqualified work-at-height personnel, unstable scaffolding).
Official source ↗
Mechanical Seal LeakRPN 120 · High
Failure Mechanism
密封面损伤
How to Detect
Detection N/A ;Re-inspect ≤every12months
Mitigation (What to Do)
  • 密封泄漏(密封气/液)监测
  • 密封冲洗系统检查
  • 密封件定期更换
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • API 617
Lessons Learned (3)
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CN-MEM-2026-03-28CN-MEM2026Fatalities 1 · Physical
Sichuan Yingda Lithium Battery Materials Co.: MVR System Secondary Separator Drain-port Scald Accident (Mar 28)
Root cause: No safe-operation management system or procedure for secondary-separator flush work (first-time task); inadequate training (wrong assessment of high-temperature / work-at-height risks); inadequate hazard investigation (residual hot water, unqualified work-at-height personnel, unstable scaffolding).
Official source ↗
CSB-CUISINE-AMMONIA-2024csb2024Safety
Cuisine Solutions 氨制冷系统泄漏
Root cause: 氨制冷系统(PSM 高危化学品)机械密封与泄漏监测缺陷;应急通风与撤离预案不足
Official source ↗
管束点蚀穿孔RPN 112 · High
Failure Mechanism
Cl- 富集、钝化膜破损
How to Detect
Detection N/A ;Re-inspect ≤every12months
Mitigation (What to Do)
  • 管束涡流检测(ECT)/UT
  • 管内窥镜抽查
  • 冷凝液 Cl- 浓度监控
  • 钝化膜状态评估
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
Lessons Learned (5)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
CSB-EXXON-BATONROUGE-2017CSB2017Injuries 4 · Fire/Safety
ExxonMobil Baton Rouge 炼厂化学品释放火灾
Root cause: 烷基化单元工艺管道/压缩机密封失效,释放后点火
Official source ↗
CSB-MILLARD-2015CSB2015Toxic
Millard Refrigerated 氨释放
Root cause: 氨制冷系统机械密封/容器完整性不足(跨行业映射至压缩机/压力容器)
Official source ↗
轴承磨损/烧瓦RPN 112 · High
Failure Mechanism
油膜破坏、对中不良
How to Detect
Detection N/A ;Re-inspect ≤every12months
Mitigation (What to Do)
  • 油膜/油质分析
  • 轴承振动温度监测
  • 对中校验
  • 润滑油路检查
RCM Strategy
PMScheduled (Proactive) Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • API 617
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CN-MEM-2026-03-28CN-MEM2026Fatalities 1 · Physical
Sichuan Yingda Lithium Battery Materials Co.: MVR System Secondary Separator Drain-port Scald Accident (Mar 28)
Root cause: No safe-operation management system or procedure for secondary-separator flush work (first-time task); inadequate training (wrong assessment of high-temperature / work-at-height risks); inadequate hazard investigation (residual hot water, unqualified work-at-height personnel, unstable scaffolding).
Official source ↗
焊缝应力腐蚀/裂纹RPN 105 · High
Failure Mechanism
残余应力+腐蚀介质
How to Detect
Detection N/A ;Re-inspect ≤every24months
Mitigation (What to Do)
  • 焊缝 MT/PT 表面检测
  • 定期 UT 体积检测
  • 硬度/残余应力抽查
  • 介质 Cl-/S 浓度监控
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • API 660
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
分布孔堵塞RPN 100 · Medium
Failure Mechanism
悬浮物/结疤
How to Detect
Detection N/A ;Re-inspect ≤every24months
Mitigation (What to Do)
  • 分布器拆检/冲洗
  • 进液过滤监控
  • 分布器前后压差监测
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • API 660
Lessons Learned (5)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
CSB-EXXON-BATONROUGE-2017CSB2017Injuries 4 · Fire/Safety
ExxonMobil Baton Rouge 炼厂化学品释放火灾
Root cause: 烷基化单元工艺管道/压缩机密封失效,释放后点火
Official source ↗
CSB-MILLARD-2015CSB2015Toxic
Millard Refrigerated 氨释放
Root cause: 氨制冷系统机械密封/容器完整性不足(跨行业映射至压缩机/压力容器)
Official source ↗
密封端面磨损RPN 100 · Medium
Failure Mechanism
颗粒、干磨
How to Detect
Detection N/A ;Re-inspect ≤every24months
Mitigation (What to Do)
  • 密封冲洗/过滤系统检查
  • 颗粒度监控
  • 密封面磨损检查
  • 冲洗液质保
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • API 617
Lessons Learned (3)
CN-MEM-2014-07-08CN-MEM2014Injuries 1 · Toxic
Qingdao Qichao Cold-storage Plant Refrigeration Compressor Liquid-ammonia Leak Accident (Jul 8)
Root cause: Compressor components not maintained in time (gasket aging); operator error in refrigeration operation (intercooler overpressure, liquid ammonia slugs back to cylinder); non-compliant emergency response; deficient safety management and training, shutdown order not enforced.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CN-MEM-2026-03-28CN-MEM2026Fatalities 1 · Physical
Sichuan Yingda Lithium Battery Materials Co.: MVR System Secondary Separator Drain-port Scald Accident (Mar 28)
Root cause: No safe-operation management system or procedure for secondary-separator flush work (first-time task); inadequate training (wrong assessment of high-temperature / work-at-height risks); inadequate hazard investigation (residual hot water, unqualified work-at-height personnel, unstable scaffolding).
Official source ↗
CavitationRPN 100 · Medium
Failure Mechanism
NPSH 不足
How to Detect
Detection N/A ;Re-inspect ≤every24months
Mitigation (What to Do)
  • NPSH 余量核算
  • 入口压力/汽蚀噪声监测
  • 叶轮/口环检查
  • 吸入管路阻力排查
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • API 610
Lessons Learned (5)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
CSB-EXXON-BATONROUGE-2017CSB2017Injuries 4 · Fire/Safety
ExxonMobil Baton Rouge 炼厂化学品释放火灾
Root cause: 烷基化单元工艺管道/压缩机密封失效,释放后点火
Official source ↗
CSB-MILLARD-2015CSB2015Toxic
Millard Refrigerated 氨释放
Root cause: 氨制冷系统机械密封/容器完整性不足(跨行业映射至压缩机/压力容器)
Official source ↗
Mechanical Seal LeakRPN 100 · Medium
Failure Mechanism
密封损伤
How to Detect
Detection N/A ;Re-inspect ≤every24months
Mitigation (What to Do)
  • 密封泄漏监测
  • 密封冲洗系统检查
  • 密封件定期更换
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • API 610
Lessons Learned (1)
2019-03-I-TXcsb2019Safety/Environmental/Fire
Intercontinental Terminals Company (ITC) Deer Park 罐区循环泵失效火灾
Root cause: 泵未纳入机械完整性/检验计划;无泄漏监测报警;无远程紧急隔离阀;罐区布置/围堰设计缺陷;PSM/RMP 监管覆盖空隙
Official source ↗
磨蚀/磨损RPN 100 · Medium
Failure Mechanism
高固含浆液
How to Detect
Detection N/A ;Re-inspect ≤every24months
Mitigation (What to Do)
  • 过流件厚度检查
  • 浆液固含/粒径监控
  • 耐磨衬里检查
  • 间隙测量
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • API 610
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
测量漂移/导压管堵塞RPN 100 · Medium
Failure Mechanism
导压管堵、零点飘
How to Detect
Detection N/A ;Re-inspect ≤every24months
Mitigation (What to Do)
  • 变送器零点校准
  • 导压管吹扫/疏通
  • 与就地比对
  • 定期校验
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • GB/T 21109
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
电机过载/烧毁RPN 96 · High
Failure Mechanism
工况偏移、堵转
How to Detect
Detection N/A ;Re-inspect ≤every24months
Mitigation (What to Do)
  • 电机电流/温度在线监测
  • 绝缘电阻/绕组检测
  • 负载曲线核对
  • 堵转保护校验
RCM Strategy
PMScheduled (Proactive) Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • API 617
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CN-MEM-2026-03-28CN-MEM2026Fatalities 1 · Physical
Sichuan Yingda Lithium Battery Materials Co.: MVR System Secondary Separator Drain-port Scald Accident (Mar 28)
Root cause: No safe-operation management system or procedure for secondary-separator flush work (first-time task); inadequate training (wrong assessment of high-temperature / work-at-height risks); inadequate hazard investigation (residual hot water, unqualified work-at-height personnel, unstable scaffolding).
Official source ↗
传感器失效RPN 96 · High
Failure Mechanism
元件老化
How to Detect
Detection N/A ;Re-inspect ≤every24months
Mitigation (What to Do)
  • 传感器定期标定
  • 冗余比对
  • 备件轮换
  • 趋势监测
RCM Strategy
PMScheduled (Proactive) Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • GB/T 21109
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
润滑失效/断油RPN 84 · High
Failure Mechanism
油系统故障
How to Detect
Detection N/A ;Re-inspect ≤every24months
Mitigation (What to Do)
  • 油压/流量/油温在线监测
  • 油滤压差
  • 油箱液位
  • 油质分析
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • API 617
Lessons Learned (1)
NUREG-LER-2011-003-BRUNSWICKNRC2011Operational
R.E. Ginna Nuclear Plant: Turbine Lube-oil Piping Fatigue Rupture Causing Reactor Trip
Root cause: High stress from original construction piping + substandard weld quality + cyclic fatigue; inadequate maintenance and inspection.
Official source ↗
不凝气积聚→传热下降RPN 80 · Medium
Failure Mechanism
排气不畅
How to Detect
Detection N/A ;Re-inspect ≤every24months
Mitigation (What to Do)
  • 不凝气排放系统检查
  • 冷凝侧真空/压力监控
  • 排气阀功能测试
RCM Strategy
PMScheduled (Proactive) Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • API 660
Lessons Learned (5)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
CSB-EXXON-BATONROUGE-2017CSB2017Injuries 4 · Fire/Safety
ExxonMobil Baton Rouge 炼厂化学品释放火灾
Root cause: 烷基化单元工艺管道/压缩机密封失效,释放后点火
Official source ↗
CSB-MILLARD-2015CSB2015Toxic
Millard Refrigerated 氨释放
Root cause: 氨制冷系统机械密封/容器完整性不足(跨行业映射至压缩机/压力容器)
Official source ↗
电机轴承失效RPN 80 · Medium
Failure Mechanism
润滑不良
How to Detect
Detection N/A ;Re-inspect ≤every24months
Mitigation (What to Do)
  • 轴承振动
  • 温度监测
  • 油质/润滑脂分析
  • 对中检查
  • 轴承冲击脉冲状态监测
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • GB/T 11348
Lessons Learned (2)
NUREG-LER-2005-012-01NUREG2005Operational
Kewaunee 余热排出泵(RHR)不可用事件(LER 2005-012-01)
Root cause: RHR 泵相关设备退化/失效
Official source ↗
NUREG-LER-2021-001-00-GINNUREG2021Operational
R.E. Ginna 辅助给水泵绕组失效(LER 2021-001-00)
Root cause: 辅助给水泵电机绕组失效
Official source ↗
可调导叶卡涩/调节失灵RPN 80 · Medium
Failure Mechanism
结垢、执行机构故障
How to Detect
Detection N/A ;Re-inspect ≤every24months
Mitigation (What to Do)
  • IGV 行程/力矩校验
  • 执行机构功能测试
  • 结垢清理
  • 位置反馈核对
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • API 617
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CN-MEM-2026-03-28CN-MEM2026Fatalities 1 · Physical
Sichuan Yingda Lithium Battery Materials Co.: MVR System Secondary Separator Drain-port Scald Accident (Mar 28)
Root cause: No safe-operation management system or procedure for secondary-separator flush work (first-time task); inadequate training (wrong assessment of high-temperature / work-at-height risks); inadequate hazard investigation (residual hot water, unqualified work-at-height personnel, unstable scaffolding).
Official source ↗
气封失效内漏RPN 80 · Medium
Failure Mechanism
迷宫密封磨损
How to Detect
Detection N/A ;Re-inspect ≤every24months
Mitigation (What to Do)
  • 级间泄漏(性能)监测
  • 密封间隙检查
  • 气封更换
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • API 617
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CN-MEM-2026-03-28CN-MEM2026Fatalities 1 · Physical
Sichuan Yingda Lithium Battery Materials Co.: MVR System Secondary Separator Drain-port Scald Accident (Mar 28)
Root cause: No safe-operation management system or procedure for secondary-separator flush work (first-time task); inadequate training (wrong assessment of high-temperature / work-at-height risks); inadequate hazard investigation (residual hot water, unqualified work-at-height personnel, unstable scaffolding).
Official source ↗
Fouling / ScalingRPN 80 · Medium
Failure Mechanism
水质/悬浮物
How to Detect
Detection N/A ;Re-inspect ≤every24months
Mitigation (What to Do)
  • 传热效率监测
  • 定期清洗
  • 进水水质监控
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • API 660
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
固体堵塞RPN 80 · Medium
Failure Mechanism
结晶/大颗粒
How to Detect
Detection N/A ;Re-inspect ≤every24months
Mitigation (What to Do)
  • 进出口压差监测
  • 进料过滤
  • 冲洗/清堵程序
  • 结晶倾向监控
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • API 610
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
阀门内漏/卡涩RPN 80 · Medium
Failure Mechanism
结垢/磨损
How to Detect
Detection N/A ;Re-inspect ≤every24months
Mitigation (What to Do)
  • 阀门内漏(声波/压差)检测
  • 行程/力矩校验
  • 阀座/阀芯检查
  • 结垢清理
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • API 550
Lessons Learned (2)
2010-06-I-GOMcsb2010Fatalities 11 · Injuries 17 · Safety/Environmental
Macondo / Deepwater Horizon Blowout
Root cause: Blowout-preventer valve sticking + cement plug failure + missing well-integrity verification.
Official source ↗
NUREG-LER-2022-001NUREG2022Operational
Susquehanna 1 号机 主蒸汽隔离阀阀座磨损泄漏
Root cause: 阀座密封面磨损与材料沉积物致内漏;未能识别阀门劣化趋势
Official source ↗
调节阀卡涩/失效RPN 80 · Medium
Failure Mechanism
结垢/执行机构
How to Detect
Detection N/A ;Re-inspect ≤every24months
Mitigation (What to Do)
  • 阀门行程/力矩校验
  • 定位器校准
  • 执行机构功能测试
  • 结垢清理
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • API 550
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
壳体均匀腐蚀减薄RPN 72 · High
Failure Mechanism
介质腐蚀、涂层失效
How to Detect
Detection N/A ;Re-inspect ≤every24months
Mitigation (What to Do)
  • 壳体壁厚超声测厚(UT)
  • 涂层/衬里完整性目视
  • 电火花检漏
  • 介质腐蚀性监测(pH/Cl-)
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
管板泄漏RPN 72 · High
Failure Mechanism
胀接松弛、腐蚀
How to Detect
Detection N/A ;Re-inspect ≤every24months
Mitigation (What to Do)
  • 管板胀接区 PT/VT 检测
  • 泄漏试验(水压/氦检)
  • 缝隙腐蚀监控
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • API 660
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-CUISINE-AMMONIA-2024csb2024Safety
Cuisine Solutions 氨制冷系统泄漏
Root cause: 氨制冷系统(PSM 高危化学品)机械密封与泄漏监测缺陷;应急通风与撤离预案不足
Official source ↗
压缩机喘振RPN 72 · Critical
Failure Mechanism
入口流量不足、防喘失效
How to Detect
Detection N/A ;Re-inspect ≤every24months
Mitigation (What to Do)
  • 防喘振控制阀/放空阀功能测试
  • 喘振裕度监测
  • 入口滤网/流量监控
  • 性能曲线核对
RCM Strategy
PMScheduled (Proactive) Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (3)
  • GB/T 7826-2012
  • API 617
  • GB/T 21109
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
变频器故障→压缩机跳闸RPN 72 · High
Failure Mechanism
过温/过流
How to Detect
Detection N/A ;Re-inspect ≤every24months
Mitigation (What to Do)
  • 变频器温/流监测
  • 散热/滤网检查
  • 电容/IGBT 状态评估
  • 参数备份
RCM Strategy
PMScheduled (Proactive) Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • API 617
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
Impeller WearRPN 64 · Medium
Failure Mechanism
颗粒磨蚀
How to Detect
Detection N/A ;Interval by RBI
Mitigation (What to Do)
  • 叶轮厚度/型线检查
  • 介质颗粒度监控
  • 口环间隙测量
  • 材质评估
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • API 610
Lessons Learned (5)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
CSB-EXXON-BATONROUGE-2017CSB2017Injuries 4 · Fire/Safety
ExxonMobil Baton Rouge 炼厂化学品释放火灾
Root cause: 烷基化单元工艺管道/压缩机密封失效,释放后点火
Official source ↗
CSB-MILLARD-2015CSB2015Toxic
Millard Refrigerated 氨释放
Root cause: 氨制冷系统机械密封/容器完整性不足(跨行业映射至压缩机/压力容器)
Official source ↗
电机过载RPN 64 · Medium
Failure Mechanism
堵转/工况偏
How to Detect
Detection N/A ;Interval by RBI
Mitigation (What to Do)
  • 电机电流/温度监测
  • 绝缘/绕组检测
  • 堵转保护校验
  • 工况核对
RCM Strategy
PMScheduled (Proactive) Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • API 610
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
CavitationRPN 64 · Medium
Failure Mechanism
NPSH 不足
How to Detect
Detection N/A ;Interval by RBI
Mitigation (What to Do)
  • NPSH 核算
  • 汽蚀噪声监测
  • 叶轮检查
  • 吸入条件排查
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • API 610
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
密封泄漏RPN 64 · Medium
Failure Mechanism
密封损伤
How to Detect
Detection N/A ;Interval by RBI
Mitigation (What to Do)
  • 密封泄漏监测
  • 冲洗系统检查
  • 密封件更换
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • API 610
Lessons Learned (1)
2019-03-I-TXcsb2019Safety/Environmental/Fire
Intercontinental Terminals Company (ITC) Deer Park 罐区循环泵失效火灾
Root cause: 泵未纳入机械完整性/检验计划;无泄漏监测报警;无远程紧急隔离阀;罐区布置/围堰设计缺陷;PSM/RMP 监管覆盖空隙
Official source ↗
Shell CorrosionRPN 60 · Medium
Failure Mechanism
介质腐蚀
How to Detect
Detection N/A ;Interval by RBI
Mitigation (What to Do)
  • 壳体外壁/内衬 VT
  • 壁厚 UT
  • 涂层完整性
  • 腐蚀速率监测
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • API 617
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CN-MEM-2026-03-28CN-MEM2026Fatalities 1 · Physical
Sichuan Yingda Lithium Battery Materials Co.: MVR System Secondary Separator Drain-port Scald Accident (Mar 28)
Root cause: No safe-operation management system or procedure for secondary-separator flush work (first-time task); inadequate training (wrong assessment of high-temperature / work-at-height risks); inadequate hazard investigation (residual hot water, unqualified work-at-height personnel, unstable scaffolding).
Official source ↗
管束腐蚀RPN 60 · Medium
Failure Mechanism
腐蚀介质
How to Detect
Detection N/A ;Interval by RBI
Mitigation (What to Do)
  • 管束 UT/ECT
  • 内衬检查
  • 介质腐蚀性监控
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • API 660
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
通信中断RPN 60 · Medium
Failure Mechanism
网络故障
How to Detect
Detection N/A ;Interval by RBI
Mitigation (What to Do)
  • 网络冗余/环网测试
  • 通信诊断
  • 接头/光纤检查
  • 链路监控
RCM Strategy
PMScheduled (Proactive) Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • GB/T 21109
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
联锁误动→非计划停机RPN 60 · Medium
Failure Mechanism
误信号
How to Detect
Detection N/A ;Interval by RBI
Mitigation (What to Do)
  • 信号回路抗扰/隔离检查
  • 传感器冗余核对
  • 误跳车根因分析
  • 联锁表决逻辑复核
RCM Strategy
PMScheduled (Proactive) Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • GB/T 21109
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
控制逻辑失效/死机RPN 56 · High
Failure Mechanism
软件/硬件故障
How to Detect
Detection N/A ;Interval by RBI
Mitigation (What to Do)
  • PLC/DCS 冗余切换测试
  • 程序版本/备份管理
  • 看门狗/自诊断
  • 定期维护
RCM Strategy
PMScheduled (Proactive) Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • GB/T 21109
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗
联锁拒动RPN 48 · Critical
Failure Mechanism
SIS 未动作
How to Detect
Detection N/A ;Interval by RBI
Mitigation (What to Do)
  • SIS 周期性功能测试(Proof test)
  • 联锁逻辑核验
  • 诊断覆盖率确认
  • 旁路管理
RCM Strategy
PMScheduled (Proactive) Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (2)
  • GB/T 7826-2012
  • GB/T 21109
Lessons Learned (3)
ARR-2023-01-KMScsb2023Safety/Environmental
Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation)
Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario.
Official source ↗
CN-MEM-2018-11-28CN-MEM2018Fatalities 24 · Injuries 21 · Fire/Explosion
河北张家口盛华化工'11·28'氯乙烯气柜泄漏爆燃事故(2018,24 死)
Root cause: 氯乙烯气柜长期未检修卡顿倾斜;操作人员未发现异常仍按常规调大回流;风险管控/应急能力差;瞒报事故误导调查
Official source ↗
CSB-ENTERPRISE-PASCAGOULA-2019CSB2019Explosion/Fire
Enterprise Pascagoula 气体处理厂爆炸火灾
Root cause: 换热器等静设备完整性不足导致烃泄漏爆炸
Official source ↗