NUREG Investigation Report No. NUREG-LER-2005-012-01 2005 Operational Operational
Kewaunee 余热排出泵(RHR)不可用事件(LER 2005-012-01)
Kewaunee Nuclear Power Plant, Wisconsin (NRC LER 50-305/2005-012-01)
Related equipment → Centrifugal pump (centrifugal_pump)
0Fatalities
0Injuries
FailureMechanism code ELP
Failure Mode · ISO 14224 Mapping
Damage mechanism (recorded in KB)
FailureELP
ISO functional code (as recorded)
ISO 14224:2016 functional failure code
ELP · External leakage - process
ISO ELP — External leakage - process.
1What Happened

RHR 泵相关失效/不可用事件,影响余热排出功能

2Root Cause

RHR 泵相关设备退化/失效

3Reliability Lessons (from investigation root cause)
  • The 'Root Cause' above is the core lesson of this accident; not split further.
4Associated Failure Mechanisms (Keywords)
RHR泵 余热排出泵 失效 不可用 电机 轴承
About the Failure-Mode Code (click to expand)

The recorded code ELP is an ISO 14224:2016 functional failure code (describes what the equipment failed to do). The damage mechanism (how it failed) is shown in the Mapping block above. The two are distinct dimensions in ISO 14224.

5Evidence Source (transparent)
Authority:U.S. Nuclear Regulatory Commission (NRC) — Licensee Event Report (LER)
Official Report:www.nrc.gov ↗
Data Verification:verified_url_nrc_pdf_2026-08-07
Report No. NUREG-LER-2005-012-01 · Data from NUREG (US NRC) public investigation conclusions, compiled by Reliability AI, for reliability demonstration purposes only. This case is derived from public incident investigation reports for learning purposes only. AIM does not endorse or guarantee its accuracy.