Accident Lesson Card · Real investigation (tap external link for official report)
← Back to KB navigation
NUREG Investigation Report No. NUREG-LER-2021-001-00-GIN 2021 Operational Operational
R.E. Ginna 辅助给水泵绕组失效(LER 2021-001-00)
R.E. Ginna Nuclear Power Plant, New York (NRC LER 50-244/2021-001-00)
Related equipment → Centrifugal pump (centrifugal_pump)
0Fatalities
0Injuries
FailureMechanism code ELP
Failure Mode · ISO 14224 Mapping
Damage mechanism (recorded in KB)
FailureELP
ISO functional code (as recorded)
ISO 14224:2016 functional failure code
ELP · External leakage - process
ISO ELP — External leakage - process.
1What Happened

辅助给水泵电机绕组失效→泵不可用,影响事故工况给水能力

2Root Cause

辅助给水泵电机绕组失效

3Reliability Lessons (from investigation root cause)
  • The 'Root Cause' above is the core lesson of this accident; not split further.
4Associated Failure Mechanisms (Keywords)
辅助给水泵 绕组 电机 失效 给水泵 轴承
About the Failure-Mode Code (click to expand)

The recorded code ELP is an ISO 14224:2016 functional failure code (describes what the equipment failed to do). The damage mechanism (how it failed) is shown in the Mapping block above. The two are distinct dimensions in ISO 14224.

5Evidence Source (transparent)
Authority:U.S. Nuclear Regulatory Commission (NRC) — Licensee Event Report (LER)
Official Report:www.nrc.gov ↗
Data Verification:verified_url_nrc_pdf_2026-08-07
Report No. NUREG-LER-2021-001-00-GIN · Data from NUREG (US NRC) public investigation conclusions, compiled by Reliability AI, for reliability demonstration purposes only. This case is derived from public incident investigation reports for learning purposes only. AIM does not endorse or guarantee its accuracy.