Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
O-ring AgingRPN 144 · High
Failure Mechanism
Temperature exceeds O-ring limit; chemical medium corrosion; O-ring installation damage or compression set
Check O-ring hardness at each maintenance; replace if hardness change >10%
Record O-ring installation date and batch
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Impeller Fatigue CrackRPN 135 · Critical
Failure Mechanism
Alternating stress (e.g., surging); material defects; resonance
Continuous vibration monitoring with alarm threshold
MT inspection every 6 months
Install anti-surge control system
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Visual inspection and dye penetrant test every 6 months
Analyze medium composition every 2 years
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
CorrosionRPN 108 · High
Failure Mechanism
Gas contains corrosive species (H2S, Cl-); moisture present; improper material selection
Visual inspect coating and insulation every 6 months
Perform UT thickness measurement every 12 months
Re-apply anti-corrosion coating every 24 months
RCM Strategy
RTFDesign Modification / Inspection Task
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
CorrosionRPN 108 · High
Failure Mechanism
Gas contains corrosive species; moisture present; improper material selection
Visual inspect coating and insulation every 6 months
Perform UT thickness measurement every 12 months
Re-apply anti-corrosion coating every 24 months
RCM Strategy
RTFDesign Modification / Inspection Task
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (20)
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 579-1/ASME FFS-1 — Fitness-For-Service
API 580 — Risk-Based Inspection
API 581-2025
GB/T 44692
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Deposit / Fouling -> Efficiency LossRPN 105 · Medium
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Visual inspect coating and insulation every 6 months
Perform UT thickness measurement every 12 months
Re-apply anti-corrosion coating every 24 months
RCM Strategy
RTFDesign Modification / Inspection Task
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (18)
API 580 — Risk-Based Inspection
API 581-2025
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Labyrinth-seal Wear -> Increased Inter-stage LeakageRPN 72 · High
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Oil-film Oscillation (Oil Whip)RPN 64 · Critical
Failure Mechanism
轴承设计参数不当(如长径比);润滑油黏度或温度异常;转子不平衡或对中不良
How to Detect
Online monitoring · Detection rate 80% ;Interval by RBI
Mitigation (What to Do)
监测轴承振动频谱
监测轴心轨迹
检查油膜压力
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (22)
API 580 — Risk-Based Inspection
GB/T 11348
GB/T 6075
GB/T 7826-2012
ISO 13372 — Condition monitoring and diagnostics of machines — Vocabulary
ISO 13374 — Condition monitoring and diagnostics of machines — Data processing, communication and presentation
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
ISO 17359 — Condition monitoring and diagnostics of machines — General guidelines
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Oil Cooler LeakRPN 64 · Critical
Failure Mechanism
冷却水水质腐蚀性强;管束材料不耐油侧温度;安装或运行中振动疲劳
How to Detect
Online monitoring · Detection rate 80% ;Interval by RBI
Mitigation (What to Do)
每周进行油品含水分析,若含水量超过0.1%则报警
每月监测冷却水出口油含量,若超过10ppm则安排检修
RCM Strategy
RTFDesign Modification / Inspection Task
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Piping VibrationRPN 63 · High
Failure Mechanism
气流脉动与管线固有频率共振;支架松动或设计不当;介质两相流
How to Detect
Online monitoring · Detection rate 80% ;Interval by RBI
Mitigation (What to Do)
每月进行振动监测,速度超过10mm/s报警
每季度检查管线支撑和支架紧固情况
每年进行振动频谱分析,识别共振
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Honeycomb Seal BlockageRPN 60 · Medium
Failure Mechanism
气体含尘或液滴;入口过滤失效;密封结构设计不合理
How to Detect
Online monitoring · Detection rate 80% ;Interval by RBI
Mitigation (What to Do)
每月监测级间压力
每6个月进行内窥镜检查
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Differential-pressure Transmitter FailureRPN 56 · Medium
Failure Mechanism
传感器老化或漂移;接线松动或接触不良;环境振动或温度影响
How to Detect
Inspection/offline · Detection rate 55% ;Interval by RBI
Mitigation (What to Do)
每半年校准差压变送器
发现读数异常时立即更换
备件库存保持2个
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Reverse-rotation DamageRPN 54 · Critical
Failure Mechanism
停机时防反转装置失效;操作失误导致反转;止逆阀故障
How to Detect
Inspection/offline · Detection rate 55% ;Interval by RBI
Mitigation (What to Do)
安装反转检测传感器,触发联锁停机
每月测试防反转装置功能
每季度检查止逆阀密封性
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Seal-face Contamination -> LeakRPN 48 · Critical
Failure Mechanism
工艺气体含固体颗粒或液滴;密封气源不洁净;密封面结焦或腐蚀
How to Detect
Online monitoring · Detection rate 80% ;Interval by RBI
Mitigation (What to Do)
每日监测密封气泄漏量,超过标准值报警
每周检查密封气过滤器压差,超过0.1MPa更换
每半年检查密封面状态,使用内窥镜
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Valve-plug StickingRPN 48 · Critical
Failure Mechanism
介质结垢或腐蚀;阀杆与衬套间隙不当;长期未动作导致粘连
How to Detect
Inspection/offline · Detection rate 55% ;Interval by RBI
Mitigation (What to Do)
每周进行部分行程测试,记录动作时间
每月检查阀位反馈与指令偏差,超过2%调整
每季度检查阀杆灵活性,添加润滑脂
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
I/O Module (Card) FailureRPN 48 · Critical
Failure Mechanism
电源波动或浪涌;卡件散热不良;固件缺陷
How to Detect
Inspection/offline · Detection rate 55% ;Interval by RBI
Mitigation (What to Do)
每季度进行冗余卡件切换测试,确保切换正常
每月检查卡件自检报警记录,若出现报警则更换
RCM Strategy
PMScheduled (Proactive) Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Probe FailureRPN 42 · High
Failure Mechanism
探头长期高温运行;感应面油污或金属屑附着;电缆绝缘破损
How to Detect
Online monitoring · Detection rate 80% ;Interval by RBI
Mitigation (What to Do)
每月进行探头间隙电压测试,若偏离基准值10%则更换
每日检查信号趋势,若出现异常跳变则排查
RCM Strategy
PMScheduled (Proactive) Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
FrettingRPN 40 · Medium
Failure Mechanism
轴向载荷波动导致微动;配合间隙过小;表面粗糙度不达标
How to Detect
Inspection/offline · Detection rate 55% ;Interval by RBI
Mitigation (What to Do)
检查推力盘表面微动痕迹
监测轴向振动
分析润滑油中磨粒
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Filter BlockageRPN 36 · High
Failure Mechanism
气体中杂质过多;过滤器未及时更换;上游管道腐蚀产生颗粒
How to Detect
Online monitoring · Detection rate 80% ;Interval by RBI
Mitigation (What to Do)
每运行2000小时更换滤芯,并记录压差初始值
每日监测过滤器压差,当压差超过0.1MPa时立即更换
每月进行油液清洁度检测,确保NAS 1638等级不超过8级
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Fouling / ScalingRPN 30 · Medium
Failure Mechanism
冷却水硬度高;冷却水温控制不当;缺乏定期化学清洗
How to Detect
Online monitoring · Detection rate 80% ;Interval by RBI
Mitigation (What to Do)
每日监测换热器进出口温差和压降
每季度化学清洗或机械清洗
根据水质分析调整阻垢剂添加量
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗
Booster Pump FailureRPN 28 · High
Failure Mechanism
电机烧毁或过载;泵体磨损或气蚀;电气控制故障
How to Detect
Online monitoring · Detection rate 80% ;Interval by RBI
Mitigation (What to Do)
每日监测泵出口压力,低于设定值报警
每周检查泵运行电流,异常时分析
每月进行振动监测,趋势分析
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (17)
API 580 — Risk-Based Inspection
GB/T 7826-2012
ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
GB/T 27921-2011
GB/T 44958-2024
GB/T 4888-2008
GB/T 29639-2020
AQ/T 3034-2022
API 581 — Risk-Based Inspection Methodology
API 571 — Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
API 754 — Process Safety Performance Indicators
API 689 — Collection and Exchange of Reliability and Maintenance Data
API 755 — Human Factors
ISO 20815:2018 — Petroleum, petrochemical and natural gas industries — Production assurance and reliability
IEC 61511:2016 — Functional safety — Safety instrumented systems for the process industry sector
ISO 31000:2018 — Risk management — Guidelines
Lessons Learned (1)
ARR-2023-01-KMScsb2023Safety/Environmental Kinder Morgan Snyder CO2 Compressor Station Closed-drain System Vessel Overpressure Rupture (CSB ARR compilation) Root cause: Wash-tower level dump valve stuck open (common in winter) + Joule-Thomson cooling froze/ hydrated off the relief path + closed-drain vessel design and overpressure protection inadequate + lack of pressure/temperature/level instrumentation; PHA did not identify the ice-plug scenario. Official source ↗