Tap any failure mode → flip to its on-site guidance (pure-CSS, no JS needed on mobile)
Gearbox (Speed Reducer/Increaser)Gearbox (Speed Reducer/Increaser)
⚠ ⚠ Top risk: Gear-tooth Pitting · RPN 96 (High) — watch this one first at the equipment
Risk Board (all 14 · by RPN · top 6 highlighted urgent)
Shield: Safety = people/environment Production = production only
Technical mechanism/mitigation body in Chinese (red line: no fabricated MT; EN UI labels translated)
14Failure Modes
7High/Critical
10Standards
2Real Accidents
Tap any failure mode to flip to its on-site guidance
Device-level standard/accident index (10 standards / 2 accidents)
Standards (10 de-duplicated)
  • API 677
  • ISO 6336
  • AGMA 2001
  • ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
  • GB/T 3480
  • GB/T 6075
  • ISO 13372 — Condition monitoring and diagnostics of machines — Vocabulary
  • API 580 — Risk-Based Inspection
  • GB/T 7826-2012
  • SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
Accident Lessons (2 de-duplicated)
NUREG-IN-94-51NRC1994
NRC 信息公告 94-51:双密封电机轴承不当加脂导致启动失败(1994,North Anna)
NUREG-LER-2006-004-FERMI2NRC2006
Fermi 2 应急柴油发电机(EDG)因控制电源变压器选型偏小整体不可用(2006)
FM Traceability Cards (14)
Generated by Reliability AI
Gear-tooth PittingRPN 96 · High
Failure Mechanism
接触疲劳在齿面萌生微裂纹
How to Detect
Online monitoring · Detection rate 90% ;Re-inspect ≤every24months
Mitigation (What to Do)
  • 齿面磁粉/涡流检测
  • 振动齿轮啮合频率分析
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (10)
  • API 677
  • ISO 6336
  • AGMA 2001
  • ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
  • GB/T 3480
  • GB/T 6075
  • ISO 13372 — Condition monitoring and diagnostics of machines — Vocabulary
  • API 580 — Risk-Based Inspection
  • GB/T 7826-2012
  • SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
Lessons Learned (2)
NUREG-IN-94-51NRC1994Operational
NRC 信息公告 94-51:双密封电机轴承不当加脂导致启动失败(1994,North Anna)
Root cause: 双密封轴承本不需加脂,但自 1986 年起每 18 个月加脂,旧脂充满轴承腔;低温下脂硬化致启动负载异常升高
Official source ↗
NUREG-LER-2006-004-FERMI2NRC2006Operational
Fermi 2 应急柴油发电机(EDG)因控制电源变压器选型偏小整体不可用(2006)
Root cause: 1998 年 MCC 改造设计错误,未核算替换接触器涌流对控制电源变压器选型的影响;Extent-of-condition 还发现 EDG 机房通风风机同隐患
Official source ↗
齿面磨粒磨损RPN 80 · Medium
Failure Mechanism
润滑油污染引入硬质颗粒
How to Detect
Online monitoring · Detection rate 88% ;Re-inspect ≤every24months
Mitigation (What to Do)
  • 油液颗粒度分析
  • 齿厚测量
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (10)
  • API 677
  • ISO 6336
  • AGMA 2001
  • ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
  • GB/T 3480
  • GB/T 6075
  • ISO 13372 — Condition monitoring and diagnostics of machines — Vocabulary
  • API 580 — Risk-Based Inspection
  • GB/T 7826-2012
  • SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
Lessons Learned (2)
NUREG-IN-94-51NRC1994Operational
NRC 信息公告 94-51:双密封电机轴承不当加脂导致启动失败(1994,North Anna)
Root cause: 双密封轴承本不需加脂,但自 1986 年起每 18 个月加脂,旧脂充满轴承腔;低温下脂硬化致启动负载异常升高
Official source ↗
NUREG-LER-2006-004-FERMI2NRC2006Operational
Fermi 2 应急柴油发电机(EDG)因控制电源变压器选型偏小整体不可用(2006)
Root cause: 1998 年 MCC 改造设计错误,未核算替换接触器涌流对控制电源变压器选型的影响;Extent-of-condition 还发现 EDG 机房通风风机同隐患
Official source ↗
齿轮箱轴承内圈缺陷RPN 72 · High
Failure Mechanism
接触疲劳致内圈剥落
How to Detect
Online monitoring · Detection rate 90% ;Re-inspect ≤every24months
Mitigation (What to Do)
  • 振动包络解调
  • 油液铁谱
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (10)
  • API 677
  • ISO 6336
  • AGMA 2001
  • ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
  • GB/T 3480
  • GB/T 6075
  • ISO 13372 — Condition monitoring and diagnostics of machines — Vocabulary
  • API 580 — Risk-Based Inspection
  • GB/T 7826-2012
  • SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
Lessons Learned (2)
NUREG-IN-94-51NRC1994Operational
NRC 信息公告 94-51:双密封电机轴承不当加脂导致启动失败(1994,North Anna)
Root cause: 双密封轴承本不需加脂,但自 1986 年起每 18 个月加脂,旧脂充满轴承腔;低温下脂硬化致启动负载异常升高
Official source ↗
NUREG-LER-2006-004-FERMI2NRC2006Operational
Fermi 2 应急柴油发电机(EDG)因控制电源变压器选型偏小整体不可用(2006)
Root cause: 1998 年 MCC 改造设计错误,未核算替换接触器涌流对控制电源变压器选型的影响;Extent-of-condition 还发现 EDG 机房通风风机同隐患
Official source ↗
齿轮箱轴承外圈缺陷RPN 72 · High
Failure Mechanism
外圈滚道疲劳剥落
How to Detect
Online monitoring · Detection rate 90% ;Re-inspect ≤every24months
Mitigation (What to Do)
  • Vibration monitoring
  • 温度趋势
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (10)
  • API 677
  • ISO 6336
  • AGMA 2001
  • ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
  • GB/T 3480
  • GB/T 6075
  • ISO 13372 — Condition monitoring and diagnostics of machines — Vocabulary
  • API 580 — Risk-Based Inspection
  • GB/T 7826-2012
  • SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
Lessons Learned (2)
NUREG-IN-94-51NRC1994Operational
NRC 信息公告 94-51:双密封电机轴承不当加脂导致启动失败(1994,North Anna)
Root cause: 双密封轴承本不需加脂,但自 1986 年起每 18 个月加脂,旧脂充满轴承腔;低温下脂硬化致启动负载异常升高
Official source ↗
NUREG-LER-2006-004-FERMI2NRC2006Operational
Fermi 2 应急柴油发电机(EDG)因控制电源变压器选型偏小整体不可用(2006)
Root cause: 1998 年 MCC 改造设计错误,未核算替换接触器涌流对控制电源变压器选型的影响;Extent-of-condition 还发现 EDG 机房通风风机同隐患
Official source ↗
润滑油降解RPN 64 · Medium
Failure Mechanism
氧化/热降解致黏度下降
How to Detect
Online monitoring · Detection rate 85% ;Interval by RBI
Mitigation (What to Do)
  • 油黏度/酸值分析
  • 定期换油
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (10)
  • API 677
  • ISO 6336
  • AGMA 2001
  • ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
  • GB/T 3480
  • GB/T 6075
  • ISO 13372 — Condition monitoring and diagnostics of machines — Vocabulary
  • API 580 — Risk-Based Inspection
  • GB/T 7826-2012
  • SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
Lessons Learned (2)
NUREG-IN-94-51NRC1994Operational
NRC 信息公告 94-51:双密封电机轴承不当加脂导致启动失败(1994,North Anna)
Root cause: 双密封轴承本不需加脂,但自 1986 年起每 18 个月加脂,旧脂充满轴承腔;低温下脂硬化致启动负载异常升高
Official source ↗
NUREG-LER-2006-004-FERMI2NRC2006Operational
Fermi 2 应急柴油发电机(EDG)因控制电源变压器选型偏小整体不可用(2006)
Root cause: 1998 年 MCC 改造设计错误,未核算替换接触器涌流对控制电源变压器选型的影响;Extent-of-condition 还发现 EDG 机房通风风机同隐患
Official source ↗
密封泄漏漏油RPN 64 · Medium
Failure Mechanism
密封件老化或轴径磨损
How to Detect
Inspection/offline · Detection rate 60% ;Interval by RBI
Mitigation (What to Do)
  • 目视检漏
  • 密封腔压力
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (10)
  • API 677
  • ISO 6336
  • AGMA 2001
  • ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
  • GB/T 3480
  • GB/T 6075
  • ISO 13372 — Condition monitoring and diagnostics of machines — Vocabulary
  • API 580 — Risk-Based Inspection
  • GB/T 7826-2012
  • SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
Lessons Learned (2)
NUREG-IN-94-51NRC1994Operational
NRC 信息公告 94-51:双密封电机轴承不当加脂导致启动失败(1994,North Anna)
Root cause: 双密封轴承本不需加脂,但自 1986 年起每 18 个月加脂,旧脂充满轴承腔;低温下脂硬化致启动负载异常升高
Official source ↗
NUREG-LER-2006-004-FERMI2NRC2006Operational
Fermi 2 应急柴油发电机(EDG)因控制电源变压器选型偏小整体不可用(2006)
Root cause: 1998 年 MCC 改造设计错误,未核算替换接触器涌流对控制电源变压器选型的影响;Extent-of-condition 还发现 EDG 机房通风风机同隐患
Official source ↗
润滑油污染RPN 60 · Medium
Failure Mechanism
密封失效引入水/颗粒
How to Detect
Online monitoring · Detection rate 88% ;Interval by RBI
Mitigation (What to Do)
  • 油液污染度检测
  • 除水过滤
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (10)
  • API 677
  • ISO 6336
  • AGMA 2001
  • ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
  • GB/T 3480
  • GB/T 6075
  • ISO 13372 — Condition monitoring and diagnostics of machines — Vocabulary
  • API 580 — Risk-Based Inspection
  • GB/T 7826-2012
  • SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
Lessons Learned (2)
NUREG-IN-94-51NRC1994Operational
NRC 信息公告 94-51:双密封电机轴承不当加脂导致启动失败(1994,North Anna)
Root cause: 双密封轴承本不需加脂,但自 1986 年起每 18 个月加脂,旧脂充满轴承腔;低温下脂硬化致启动负载异常升高
Official source ↗
NUREG-LER-2006-004-FERMI2NRC2006Operational
Fermi 2 应急柴油发电机(EDG)因控制电源变压器选型偏小整体不可用(2006)
Root cause: 1998 年 MCC 改造设计错误,未核算替换接触器涌流对控制电源变压器选型的影响;Extent-of-condition 还发现 EDG 机房通风风机同隐患
Official source ↗
齿面胶合/擦伤RPN 54 · High
Failure Mechanism
瞬时温升致油膜破裂金属接触
How to Detect
Online monitoring · Detection rate 82% ;Interval by RBI
Mitigation (What to Do)
  • 齿面温度监测
  • 润滑油极压性检测
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (10)
  • API 677
  • ISO 6336
  • AGMA 2001
  • ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
  • GB/T 3480
  • GB/T 6075
  • ISO 13372 — Condition monitoring and diagnostics of machines — Vocabulary
  • API 580 — Risk-Based Inspection
  • GB/T 7826-2012
  • SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
Lessons Learned (2)
NUREG-IN-94-51NRC1994Operational
NRC 信息公告 94-51:双密封电机轴承不当加脂导致启动失败(1994,North Anna)
Root cause: 双密封轴承本不需加脂,但自 1986 年起每 18 个月加脂,旧脂充满轴承腔;低温下脂硬化致启动负载异常升高
Official source ↗
NUREG-LER-2006-004-FERMI2NRC2006Operational
Fermi 2 应急柴油发电机(EDG)因控制电源变压器选型偏小整体不可用(2006)
Root cause: 1998 年 MCC 改造设计错误,未核算替换接触器涌流对控制电源变压器选型的影响;Extent-of-condition 还发现 EDG 机房通风风机同隐患
Official source ↗
齿根疲劳断裂RPN 48 · Critical
Failure Mechanism
弯曲应力循环致齿根裂纹
How to Detect
Online monitoring · Detection rate 85% ;Interval by RBI
Mitigation (What to Do)
  • 齿根磁粉检测
  • 在线声发射监测
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (10)
  • API 677
  • ISO 6336
  • AGMA 2001
  • ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
  • GB/T 3480
  • GB/T 6075
  • ISO 13372 — Condition monitoring and diagnostics of machines — Vocabulary
  • API 580 — Risk-Based Inspection
  • GB/T 7826-2012
  • SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
Lessons Learned (2)
NUREG-IN-94-51NRC1994Operational
NRC 信息公告 94-51:双密封电机轴承不当加脂导致启动失败(1994,North Anna)
Root cause: 双密封轴承本不需加脂,但自 1986 年起每 18 个月加脂,旧脂充满轴承腔;低温下脂硬化致启动负载异常升高
Official source ↗
NUREG-LER-2006-004-FERMI2NRC2006Operational
Fermi 2 应急柴油发电机(EDG)因控制电源变压器选型偏小整体不可用(2006)
Root cause: 1998 年 MCC 改造设计错误,未核算替换接触器涌流对控制电源变压器选型的影响;Extent-of-condition 还发现 EDG 机房通风风机同隐患
Official source ↗
不对中齿面偏载RPN 45 · Medium
Failure Mechanism
轴系不对中致载荷偏置
How to Detect
Online monitoring · Detection rate 85% ;Interval by RBI
Mitigation (What to Do)
  • 激光对中
  • 齿面接触斑点检查
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (10)
  • API 677
  • ISO 6336
  • AGMA 2001
  • ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
  • GB/T 3480
  • GB/T 6075
  • ISO 13372 — Condition monitoring and diagnostics of machines — Vocabulary
  • API 580 — Risk-Based Inspection
  • GB/T 7826-2012
  • SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
Lessons Learned (2)
NUREG-IN-94-51NRC1994Operational
NRC 信息公告 94-51:双密封电机轴承不当加脂导致启动失败(1994,North Anna)
Root cause: 双密封轴承本不需加脂,但自 1986 年起每 18 个月加脂,旧脂充满轴承腔;低温下脂硬化致启动负载异常升高
Official source ↗
NUREG-LER-2006-004-FERMI2NRC2006Operational
Fermi 2 应急柴油发电机(EDG)因控制电源变压器选型偏小整体不可用(2006)
Root cause: 1998 年 MCC 改造设计错误,未核算替换接触器涌流对控制电源变压器选型的影响;Extent-of-condition 还发现 EDG 机房通风风机同隐患
Official source ↗
联轴器不对中RPN 45 · Medium
Failure Mechanism
安装误差或热膨胀偏移
How to Detect
Online monitoring · Detection rate 90% ;Interval by RBI
Mitigation (What to Do)
  • 激光对中
  • 振动谐波分析
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (10)
  • API 677
  • ISO 6336
  • AGMA 2001
  • ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
  • GB/T 3480
  • GB/T 6075
  • ISO 13372 — Condition monitoring and diagnostics of machines — Vocabulary
  • API 580 — Risk-Based Inspection
  • GB/T 7826-2012
  • SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
Lessons Learned (2)
NUREG-IN-94-51NRC1994Operational
NRC 信息公告 94-51:双密封电机轴承不当加脂导致启动失败(1994,North Anna)
Root cause: 双密封轴承本不需加脂,但自 1986 年起每 18 个月加脂,旧脂充满轴承腔;低温下脂硬化致启动负载异常升高
Official source ↗
NUREG-LER-2006-004-FERMI2NRC2006Operational
Fermi 2 应急柴油发电机(EDG)因控制电源变压器选型偏小整体不可用(2006)
Root cause: 1998 年 MCC 改造设计错误,未核算替换接触器涌流对控制电源变压器选型的影响;Extent-of-condition 还发现 EDG 机房通风风机同隐患
Official source ↗
箱体裂纹RPN 42 · High
Failure Mechanism
铸造缺陷或过载冲击
How to Detect
Online monitoring · Detection rate 80% ;Interval by RBI
Mitigation (What to Do)
  • 磁粉/渗透检测
  • 应变监测
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (10)
  • API 677
  • ISO 6336
  • AGMA 2001
  • ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
  • GB/T 3480
  • GB/T 6075
  • ISO 13372 — Condition monitoring and diagnostics of machines — Vocabulary
  • API 580 — Risk-Based Inspection
  • GB/T 7826-2012
  • SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
Lessons Learned (2)
NUREG-IN-94-51NRC1994Operational
NRC 信息公告 94-51:双密封电机轴承不当加脂导致启动失败(1994,North Anna)
Root cause: 双密封轴承本不需加脂,但自 1986 年起每 18 个月加脂,旧脂充满轴承腔;低温下脂硬化致启动负载异常升高
Official source ↗
NUREG-LER-2006-004-FERMI2NRC2006Operational
Fermi 2 应急柴油发电机(EDG)因控制电源变压器选型偏小整体不可用(2006)
Root cause: 1998 年 MCC 改造设计错误,未核算替换接触器涌流对控制电源变压器选型的影响;Extent-of-condition 还发现 EDG 机房通风风机同隐患
Official source ↗
键槽剪切失效RPN 36 · High
Failure Mechanism
过载或键配合松动
How to Detect
Inspection/offline · Detection rate 70% ;Interval by RBI
Mitigation (What to Do)
  • 扭矩限制器
  • 键槽目视检查
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (10)
  • API 677
  • ISO 6336
  • AGMA 2001
  • ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
  • GB/T 3480
  • GB/T 6075
  • ISO 13372 — Condition monitoring and diagnostics of machines — Vocabulary
  • API 580 — Risk-Based Inspection
  • GB/T 7826-2012
  • SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
Lessons Learned (2)
NUREG-IN-94-51NRC1994Operational
NRC 信息公告 94-51:双密封电机轴承不当加脂导致启动失败(1994,North Anna)
Root cause: 双密封轴承本不需加脂,但自 1986 年起每 18 个月加脂,旧脂充满轴承腔;低温下脂硬化致启动负载异常升高
Official source ↗
NUREG-LER-2006-004-FERMI2NRC2006Operational
Fermi 2 应急柴油发电机(EDG)因控制电源变压器选型偏小整体不可用(2006)
Root cause: 1998 年 MCC 改造设计错误,未核算替换接触器涌流对控制电源变压器选型的影响;Extent-of-condition 还发现 EDG 机房通风风机同隐患
Official source ↗
共振RPN 30 · Medium
Failure Mechanism
转速接近系统固有频率
How to Detect
Online monitoring · Detection rate 85% ;Interval by RBI
Mitigation (What to Do)
  • 模态分析
  • 转速规避区设定
RCM Strategy
CBMOn-Condition Maintenance
Interval: High risk 1-3 mo / Medium 6-12 mo / Low risk at turnaround (by API 581 RBI risk ranking)
Engineering-inferred (not measured history); confirm with equipment owner before execution
Standards (10)
  • API 677
  • ISO 6336
  • AGMA 2001
  • ISO 14224:2016 — Petroleum, petrochemical and natural gas industries — Collection and exchange of reliability and maintenance data for equipment
  • GB/T 3480
  • GB/T 6075
  • ISO 13372 — Condition monitoring and diagnostics of machines — Vocabulary
  • API 580 — Risk-Based Inspection
  • GB/T 7826-2012
  • SAE JA1011_202411 — Evaluation Criteria for Reliability-Centered Maintenance Processes
Lessons Learned (2)
NUREG-IN-94-51NRC1994Operational
NRC 信息公告 94-51:双密封电机轴承不当加脂导致启动失败(1994,North Anna)
Root cause: 双密封轴承本不需加脂,但自 1986 年起每 18 个月加脂,旧脂充满轴承腔;低温下脂硬化致启动负载异常升高
Official source ↗
NUREG-LER-2006-004-FERMI2NRC2006Operational
Fermi 2 应急柴油发电机(EDG)因控制电源变压器选型偏小整体不可用(2006)
Root cause: 1998 年 MCC 改造设计错误,未核算替换接触器涌流对控制电源变压器选型的影响;Extent-of-condition 还发现 EDG 机房通风风机同隐患
Official source ↗